Metal Roof Installation 2 of 6

Video Statistics and Information

Video
Captions Word Cloud
Reddit Comments
Captions
[Music] before the installation of any type of roof system an inspection should be done to make sure all the sheathing and framing components are in good condition and fastened properly upon a completed inspection with any repairs being made the entire roof should be covered by high-quality underlayment synthetic underlayment is recommended and should be installed over the main roof decking installation should be done according to the manufacturer's recommendations and also in compliance with all building codes in weather climates with freezing temperatures a high temperature non granule ice and water shield is also recommended it will need to be considered for installation along the eaves and rake edges in the valleys the hip and ridge assemblies and around all roof penetrations and flashings once again installers should be knowledgeable of all state and local building codes when installing new roof products with regards to fire ratings a class-a fire rating can be achieved by covering the entire roof area with an approved material it must be applied over the sheathing or existing roof and beneath the new underlayment if metal panels are installed directly over a synthetic underlayment without a fire resistant material a Class C fire rating is achieved upon completion of all underlayment being installed the starter flashing can then be applied along the eaves and up the rakes to the gable ends along the eaves starter should be bent in the field to match the angle of the roof pitch and then securely fastened along the EU a couple of nails can be used to hold the starter in place and then it should be fastened down using galvanized screws evenly spaced and long enough to penetrate the roof decking by at least a half an inch [Music] Eve's starter should be overlapped by at least two inches when multiple pieces are used and creating tasks for the fasteners will help guide the screws through the metal when Eve's starter reaches the corner it should be filled cut so the joining pieces can wrap around the corner and overlap each other upon completing the installation of the starter along the eave ice and water shield should be applied over the starter to create a permanent watertight seal starter flashing is also installed along the roof rake going up to the gable peak starting at the bottom the first piece should be field cut to overlap the eave starter and then properly fastened moving up the gable along the rake the starter platy should be installed over the underlayment and when reaching the peak the joining pieces should be once again filled cut to overlap and then securely fastened you
Info
Channel: CrewcutTV
Views: 2,021,190
Rating: 4.3726768 out of 5
Keywords: Metal Roof, Metal Roof Installation
Id: kSDy99fnTRE
Channel Id: undefined
Length: 4min 10sec (250 seconds)
Published: Mon Sep 02 2013
Related Videos
Note
Please note that this website is currently a work in progress! Lots of interesting data and statistics to come.