Longevity T-Top Vinyl Railing Installation

Video Statistics and Information

Video
Captions Word Cloud
Reddit Comments
Captions
[Music] thank you for choosing t-top vinyl railway the t-top vinyl rail system is a low-maintenance affordable option engineered with many features found in more expensive rail products each t-top kit contains a set of easy-to-follow instructions that will enable you to assemble the railing very quickly gather the tools needed to complete the job crosscut saw measuring tape drill motor with a 1/8 inch drill bit a Philips head screw bit a level clamps a hammer and a pencil in this installation 4x4 wooden posts have already been securely installed with the proper spacing to accommodate the new vinyl rail sections locate the proper size vinyl post sleeves and slide them over the existing 4x4 posts each section of your key top vinyl railing will be installed between two rail posts make sure the post base trim is in place before installing a rails to prepare for the rail installation cut to 2 inch wood spacer blocks position the spacers between the posts to temporarily assist in aligning the rail section if you are not using your rails at their full length you will have to cut the rails to size start by placing a bottom rail on the spacer block across the post opening leaving equal spacing from the last balusters hole and post on each end next mark the bottom rail 1/8 inch from the end of the post to allow room for the bracket and expansion finish by aligning the top rail with the bottom rail and mark the top rail now cut both rails with a miter box hacksaw or chop saw [Music] note that you will have to cut through an aluminum insert in the top rail now you are ready to install the bottom Ram start by sliding a rail bracket cover and bracket onto each end of the rail ensure that the bracket is level and centered to the post [Music] be sure to hold the bracket firmly in place when drilling on an angle use a 1/8 inch drill bit to carefully pre-drill the first bottom bracket screw hole drilling through the bracket hole post sleeve and post then drive the first number 10 1 and 1/2 inch screw through the bottom bracket into the post pre-drill and screw in the remaining 3 screws for the first bottom bracket but that's the second bottom bracket in the same one the kit comes with 2 balusters with lock tabs on end install those 2 balusters in the holes closest to the end posts the balusters lock tabs must face the outer edge of the routed holes next insert the balusters into the remaining holes on the bottom rail [Music] be sure to place the brackets on both ends of the top rail before attaching the top rail to the balusters to attach the top rail beginning at one side of the rail align the first balusters with the first routed home snap the top rail into position continue down the rail snapping the balusters into the top rail make sure rails are fully seated with balusters and that they are level and centered to post-sleep then using a 1/8 inch drill bit pre-drill the first top bracket screw hole drill through the bracket hole vinyl post sleeve and vinyl insert and loosely install the first number 10 1 and 1/2 inch screw remember and drilling on an angle be sure to hold the bracket firmly in place repeat the pre drilling process for the remaining three screws and tighten all screws remember to go back and tighten the first screw if that's the second bracket the same way once the brackets are secured to the posts install the side bracket screws for each install bracket pre-drill in the center of each elongated hole with a 1/8 inch drill bit note that in some cases you will be drilling through aluminum as well as the vinyl railing now installed number 10 running screws in all pre-drilled holes each bracket comes with a small vinyl cover match the letter on the bracket cover to the letter on the bracket and snap them into place [Music] in this next section we will show you how to install a stair rail using pre molded brackets first measure and cut a 1 and 1/4 deck board and temporarily secure the deck board spacer on the nose of the stairs between the posts the thickness of the deck board will determine the space between the stairs in the bottom rail pre assemble the rail by placing the balusters in the bottom ring the kit comes with two balusters with locked tabs on the end install those two balusters on the ends closest to posts snap the remaining balusters into the bottom rail and align and snap them into the top rim now ask an assistant to help move the preassembled rail into position on the 1 and 1/4 deck board spacer slide the rail up or down until the balusters hole spacing is even on each end to allow for the proper bracket fit position and clamp the rail in place to assist with assembly mark the post line on each rail and leaving 1/8 inch for expansion after both ends of the rail or mars remove the assembly and cut each of the rail ends so the balusters holes fit evenly between the posts once the rails are cut reassemble the rail remember to use the two balanced stirs with lock tabs on the end holes closest to posts as in the pre assembly step snap the center non tab balusters into the bottom rail and insert the other end into the corresponding holes in the top rail next slide a bracket onto each end of the bottom and top rail ends now reposition the rail between the post on the 1 and 1/4 inch deck board slide the brackets against the posts once you have checked for a proper fit in plumb you are ready to attach the brackets to the rails using a 1/8 inch drill bit carefully pre-drill the first bottom bracket and the center of the elongated screw hole you will need to drill through the bracket hole post Jacket and post when drilling on an angle be sure to hold the bracket firmly in place then drive the first number 10 one inch mounting screw through the bottom bracket into the post now pre-drill and screw in the remaining three screws for the first bottom bracket be careful not to over tighten the screw or the bracket may crack until you attaching the three remaining brackets in the same fashion once the brackets are secured to the posts install the side bracket screws for each installed bracket pre-drill in the center of each elongated hole with a 1/8 inch drill bit know that in some cases you will be drilling through aluminum as well as the vinyl railing now install number 10 1 inch screws in all pre-drilled holes once all the screws are installed you can snap the bracket covers in place that's the letters on the inside of the bracket cover to the letter on the bracket our t-top railings are beautiful durable and easy to install finally add the post caps congratulations on installing your new tee top railing learn more by visiting us at longevity fence systems.com
Info
Channel: Longevity Fence Systems
Views: 58,168
Rating: 4.7583895 out of 5
Keywords: vinyl railing, deck railing, vinyl railing installation, railing installation, t-top railing, t-top railing installation
Id: WlAzbOKvU-M
Channel Id: undefined
Length: 9min 24sec (564 seconds)
Published: Fri Sep 01 2017
Related Videos
Note
Please note that this website is currently a work in progress! Lots of interesting data and statistics to come.