How To Build A Shed - Part 9 - Install Asphalt Shingles On Shed Roof

Video Statistics and Information

Video
Captions Word Cloud
Reddit Comments
Captions
welcome to this asphalt shingle installation video here you will learn about the steps to installing asphalt shingles on your storage shed this video describes asphalt shingle installation in nine common steps it is recommended to also refer to your manufacturer's installation steps that are specific to the product you are using the first step to installing asphalt shingles is to install the drip edge on the eave edge of the roof cut the one-and-a-half by one-and-a-half metal drip edge pieces using ten snips make a corner in each of the shed roof end pieces and extend the drip edge up the rake of the roof to inches the drip edge is set directly on top of the roof sheeting and fascia trim it goes under the building paper to allow any moisture running down on top of the paper to be on top of the drip edge nail the drip edge to the roof deck using one nail every 24 inches the second step is to install the 15-pound building paper building paper can be very slippery so great care must be taken when standing on it roofing paper nails with plastic caps work best to hold the paper without ripping it make sure to only stand on places that are well nailed on and also always try to stand on the plastic nail head line the paper up with the drip edge and install one nail near the corner end it can overhang the rake and be cut off squarely later roll the paper out along the drip edge align it with the drip edge and install a second nail to hold it in place go back and install the nails every 12 inches along the edges and 24 inches in the center the top edge does not need to be nailed because it will be nailed on with the next overlapping row install each successive row making sure to overlap the previous row by 4 inches minimum the third step is to install the drip edge along the rakes of the roof the rake drip edge is installed on top of the building paper so that any moisture will be diverted above the paper cut the building paper off flush with the fascia board before installing the drip edge start at the lower end of the rake and overlap the two inch return from the eave H that was installed earlier at the ridge you can either cut the drip edge to terminate at the ridge or on smaller sheds you can use one piece of drip edge to cover both sides of the roof rakes the fourth step is to make horizontal alignment marks on the building paper to help you keep the rows of asphalt shingles straight start by measuring up from the drip edge along the roof rakes and placing a mark every 12 inches use a chalk line to mark lines across the roof between the marks so you have horizontal lines that are parallel to the eave the fifth step is to install a row of starter strip shingles starter strips are used to help the first row of shingles that sit over the top of the drip edge to stick to the roof without having nail heads showing they can be purchased pre-made or you can make them from regular shingles you purchase to install on the roof since most sheds only need a few starter strip pieces it is typically more economical to cut the starter strips from shingles to make a starter strip from regular shingles you will flip a shingle over and cut it lengthwise along the tar strip just above the tops of the factory made slits cut enough shingles to run along both eaves of the shed cut six inches off the first starter strip so that the joint and the starter strip row are offset six inches from the row of shingles that will go directly on top of it the first starter strip installed will be the one that you cut six inches off of install the starter strip upside down making sure that the edge with the tar strip is on top of the drip edge there should be a 3/8 inch overhang over both the eave and rake drip edges put a nail every 12 inches just above the tar strip and one inch from the ends continue installing starter strips along the eave drip edge they should be 36 inches long and the ends butted against each other the sixth step is to install the first six rows of shingles each row of shingles will be offset from the previous row by six inches this prevents water from running down between the shingle joints and into the shed start at the same end of the eave that you started the starter strip on and install a full 36 inch long shingle over the starter strip maintain the same 3/8 inch overhang of the drip edge by lining the shingle up with the starter strip each shingle gets four nails one on each end and one above each of the slits nails are typically installed five eighths of an inch from the top of the slits and not in the tar strip continue installing the first row using full 36 inch shingles cut the end of the first row before moving to the second row so that you will have a reference point for the three-eighths inch overhang when you cut the next few rows of shingles that are installed start the second row with a six-inch offset from the first row and using a full 36 inch long shingle continue installing rows of shingles always starting with a six inch offset and letting the ends overhang the rake until you have six rows installed as you install each row you will visually line it up with the horizontal marks you made on the building paper to keep the rows straight now return to the starting ends of the shingles and install filler pieces make sure that the pieces follow the same joint offset pattern as the shingles previously installed on the roof these ends can also overhang the rake of the roof this is a good place to use scrap ends from other parts of the roof the seventh step is to cut the shingle ends off after the first six rows are installed on this project we got ahead of ourselves and forgot to cut the shingles after the first six rows but the process is the same you will use the straight edge of a spare shingle to line up your cut flip a shingle over and line the straightedge up with the three-eighths inch overhang of the lower shingle on the top end you will hold the straightedge three-eighths of an inch off the drip edge use your utility knife to cut along the straight edge of the shingle it sometimes takes several passes with the knife to cut all the way through now clean the cut edges of the shingles by using a scrap piece of asphalt roofing to burnish the cut edges of the shingles that are installed on the roof the eighth step is to continue installing shingles in six row sets the seventh row of shingles will start with a full shingle just like the first row installed the shingle ends in the video should have been cut before the seventh row was installed continue following the same six row pattern that you did the first time and install the shingles until you get to the refrig the last row of shingles can overlap the ridge if you are not using a ridge vent if they overlap they can be nailed to the opposite roof the ninth step is to install the ridge cap the ridge cap pieces can be purchased as pre-cut pieces or you can cut them from shingles if you are cutting them you will flip several shingles over and cut them into thirds by cutting from the top of the slits to the edge of the shingle start at the end of the shed that is most visible and fold the cut shingles over the ridge with half of the shingle running down each roof slope the finished gravel face of the shingle should be facing up and overhanging the drip edge like the regular shingles the unfinished part should be facing toward the center of the shed install one nail on each end of the shingle just below the black tar line like you did the regular shingles all successive ridge cap pieces overlap the previous pieces similar to how you installed them on the main roof when you get to the end of the ridge you will cut the unfinished part of the shingle off and then nail it on directly through the finished face use a DAP of roofing mastic on each of the nail heads to prevent leaking continue learning about shed building by clicking on one of these videos thanks for watching
Info
Channel: iCreatables
Views: 1,042,235
Rating: undefined out of 5
Keywords: Shed Plans, How To Build A Shed, How to install asphalt shingles, shed roof install, how to install shed roof, installing shed roof
Id: t0wwu-jlY2M
Channel Id: undefined
Length: 9min 40sec (580 seconds)
Published: Mon Jan 20 2014
Related Videos
Note
Please note that this website is currently a work in progress! Lots of interesting data and statistics to come.