r/Prorevenge Screw Me Over? I'll Make You Pay Me $30,000!

Video Statistics and Information

Video
Captions Word Cloud
Reddit Comments
Captions
welcome to R Pro Revenge where op makes an easy thirty thousand dollars our next way to postage from saitamajet so I'm living in Japan now and over here people ride bicycles a lot you can't leave your bike anywhere and you have to pay for parking between one and two dollars per day there are very few free parking areas for bicycles most people leave their bikes at the same place so they pay monthly because it's cheaper and you have your own space this started a couple of weeks ago someone in my building started having a guest who decided to steal my bicycle parking space whenever they came to visit sometimes they stayed the whole night so I had to go to the station pay one dollar and come all the way home walking which meant that I would also need to walk to the station the next day so get up earlier walk like 20 minutes to the station while carrying my heavy bag all the bicycle spaces have a number which means they're reserved for someone my number is 105 but this douchebag decided to take my spot whenever they came to visit the second time this happened I told the building manager but they didn't do anything the third time that I saw the bicycle there I love to note in Japanese saying please don't leave your bicycle here this is my space that I use every day I found the note taped to my parking space and it had a couple of bad words in Japanese at the end basically he wasn't only stealing my space but making fun of me by insulting me fine that's just fine I probably wouldn't have done anything about it if he hadn't written those words but this triggered me and got the worst in me this person did it again a couple of times so I knew this would continue I was thinking about buying another bicycle a better more expensive one that I could use to go on cycling trips so I needed a good chain slash lock anyways I bought one of the thickest locks they had at the store and decided to try out its efficiency I locked up his bicycle then next time that I saw it there it hasn't moved for the last seven days the guy left two notes the first one was a very aggressive one with more bad words and threats about going to the cops which I don't care let's go that way buddy the second note Days Later was an apology and They begged for me to unlock the bike because they tried to break it but they couldn't I guess he's learned his lesson I'm pretty sure he won't do it again but I just want to enjoy this feeling of Victory a couple of days more I'll set the bike free in two to three days I guess so this post was posted by saitama jet so I'm imagining this person is the unlicensed bicycle Rider which if you don't read one punch man won't make any sense but any one punch man fans out there our next Reddit post is from balls to Asia several years ago Barry my boss did a job for Big Daddy construction and got screwed it wasn't a huge amount of money just a couple of thousand dollars but screwed is screwed basically he accepted Big Daddy's word on something that they denied later Barry consulted his lawyer and was told that since the issue wasn't in writing that any legal action was likely to fail and even if he won the legal cost would exceed any settlement and Big Daddy basically said my lawyer can beat up your lawyer Barry then asked what every lawyer likes to hear what should I have done differently fast forward to 2017. Big Daddy is soliciting bids for a new restaurant called Fancy Pants Barry submits a bid for supplying and installing door hardware things like doorknobs emergency exit bars door closers that pulled the door shut and three automatic door operators an automatic door operator is something you've seen before it has a metal plate with a wheelchair logo mounted on the wall when you press it a motor opens a door it's designed to allow people with limited Mobility to pass through a doorway Barry wins the bid and calls a meeting he's handling this job personally all all communication with big daddy is to go through Barry and only Barry if someone from Big Daddy calls and says nice weather isn't it we're supposed to reply I wouldn't know anything about it let me transfer you to Barry's line under no circumstances is anyone from Big Daddy to be given Barry's cell phone number all after hours and on-call texts are only to return the call and say that Barry will be in touch the next morning violation of any of this will be grounds for immediate dismissal for cause is that perfectly clear a few weeks go by and we get a call from general contractor who's not only running the job for Big Daddy but his big daddy's son he's an Untitled douchebag of a tyrant with anger issues and a vocabulary that relies heavily on profanity for those who don't know a general contractor is responsible for ensuring that everything gets done on a construction site in the correct order for example if you're building a bathroom first you put up the wall studs then the electrical is run then the plumbing supplies are roughed in next the drywall goes up then the tile then the baseboards then the wall ceiling and trim gets painted then the cabinets light fixtures and switches are installed lastly the plumbing fixtures go in so as you can see a general contractor has to deal with several different subcontractors and coordinate their efforts it's a stressful job and you need the cooperation of various people and it's hard to get people to work with you if you're screaming swear words at them something that this general contractor never figured out we had to install three automatic door openers two on the entrance and one on the handicap washroom the conventional washrooms are down a set of stairs on the right and by law there has to be a washroom available for people using wheelchairs this bathroom is on a bit of a corridor of sorts used by the servers to bring food in and dishes out the partition separating the corridor are about shoulder High separating the corridor from the seating area yeah the decor of this restaurant was fancy and it was meant to resemble a Victorian gentleman's club with Oak throughout and thick Carpets on the floor the feature wall at the front is also worthy of mention with alcoves for displaying sculptures and places to hang paintings so the general contractor calls us because they're ready for the automatic door openers to be installed we arrive and install everything by the terms of the bid its Big Daddy's responsibility to supply dedicated 120 volt electricity for the automatic door openers and to run the 12 volt wires from the activation plates to the top of the doorway so they can be connected to the circuit board for the none of this was present at the time of the install so Barry ran and extension cord to power the automatic door openers and he used a wireless transmitter and receiver to trigger it all of this was specified in the bid which said that we could install and then return to hook up the wires once they get run Barry came and personally supervised the technician who was installing the automatic door openers when the general contractor signed off on the work buried deep in the description was a line or two referencing the relevant sections of the bid when the general contractor signed off on the handicap washroom install there was a line noting that big daddy assumes all responsibility for compliance with the relevant building code section the general contractor didn't bother to read what he was signing he just scribbled a signature and took his copy Barry made certain that the technician was right beside him when the general contractor signed off malicious compliance number one it's about two weeks before opening and Big Daddy is in the finishing stages Barry gets a frantic call from the general contractor that none of the automatic door openers are working and they need these to be functional or they won't get their occupancy permits Barry heads down the next day with the tech Barry says well I found the problem the general contractor says so then fix the effing problem them there's no 120 volt run to the doors and there's no 12 volt wires to hook up the buttons you didn't run the power why didn't you run the power it's not in the scope of work in the bid you're supposed to do it why didn't you tell me that when you were here the first time I did and you signed off on it where's the effing electrician electrician get your butt over here huh what's up why isn't there any power for these door operators it's not part of my scope of work Barry says there's some good news what if we use wireless for the buttons then we won't need 12 volt wires I'll have to bill you for it as an add-on but once you get me 120 volts those automatic door openers will be working at this point general contractor realizes how screwed he is the restaurant interior is like 90 complete and there's no power to a critical part of the building without that power no permits big Daddy has screwed up big time because he assumed that either Barry or the electrician would run the wires even though it wasn't put into the scope of either of our bids the electrical panel is in the back of the kitchen and there's no way to bring 120 volts to the front entrance except across the ceiling which would be nearly impossible all the lighting and the ornate fall ceiling was already in even if the electrician was able to magically do that he would either have to run a metal conduit down the surface of the feature wall or rip out a good chunk of it run the wires and reinstall it the handicap washroom automatic door opener wasn't much of a problem since it was closer and the wires could be run through the false ceiling the electrician charged the general contractor big dollars for the extra work malicious compliance number two remember that handicap washroom well when the building inspector came to do a pre-check they discovered that the square footage of the washroom minus the area taking up by the inward swinging door was less than the required minimum this needed a quick fix because dismantling the washroom and moving a wall and relocating the plumbing fixtures would be too expensive and would take too long so the general contractor decided to reverse the swing of that door and have it swing into the corridor rather than into the washroom this had a really bad effect on the operation of Fancy Pants once it opened because anytime someone wanted to use the washroom the door blocked the flow of servers in and out of the kitchen and people are lazy so even able-bodied people were prone to using this washroom because it was closest I don't know what the conversations between Fancy Pants and Big Daddy were like but I imagine they were pretty intense but who cares after all the general contractor signed off on that too also Barry got to send an invoice for an entirely separate automatic door opener because the original was a pull style and reversing the swing meant a push style was required and now the pro Revenge the general contractor called Barry a few days after discovering the entrance doors needed 120 volts to tell Barry that 120 volts were available Barry headed down to the restaurant with a tech to check it out in the vestibule was a heater known as an air curtain it's a big heater designed to push a high volume of warmed air into the vestibule to mitigate cold outside air entering the restaurants it pulls a significant amount of electricity every time it kicks on and the general contractor had tied the 120 volts for the entrance door's automatic door openers into the same circuits Barry explains that their bid specified that the automatic door openers required their own dedicated circuits one for each the general contractor responds that he doesn't care just hook the damn things up so Barry does just that and he has the general contractor sign off again only this time buried in the sign off sheet is an acknowledgment that by not not providing dedicated circuits all warranties are void and subsequent service would be billable just like usual the general contractor scribbles his signature and takes his copy without reading it these automatic door openers are finicky about power there's a motor controlled by a circuit board that determines how fast the door opens how long it stays open how fast it closes how much force is used that sort of thing if it takes a spike in power it fails and the automatic door opener no longer functions a power Spike blows a fuse and damages one of the components of the control board this is replaceable and that part is worth like 30 bucks the control board can be fixed in about half an hour with another half hour on top of that to make sure everything is running correctly Barry had sent one of his texts to the manufacturer to get certified in rebuilding the board even though our standard was to just ship them back to the manufacturer and get a replacement sure enough a couple of days later the general contractor calls in a panic they have the final occupancy inspection scheduled for the next day and one of the automatic door openers at the entrance is down your effing automatic door opener isn't working get down here and fix it okay but it's not covered under warranty so it's billable what the f are you talking about it hasn't even been a week and it's broken so it is under warranty no warranties were all avoided when you didn't provide clean power F that get down here and put in a new automatic door opener it doesn't need a new automatic door opener it needs a new control board and I can get a new control board from the manufacturer in about four to six weeks the general contractor loses his mind there's no way that he can delay the opening of Fancy Pants for six weeks waiting for a single part he calls Barry every name in the book threatens legal action Etc Barry responds look general contractor I have a control board on the shelf that was was rebuilt by a factory certified technician I can let you have it at eighty percent of the list price of a new one and I can have it installed by noon tomorrow do you want to rebuild or do you want a new part and do you agree that this is billable as per the terms of the bid yes just get the effing thing fixed by tomorrow now Barry knows that general contractor and Big Daddy were gonna try to screw him just like they did years ago that time it was a I never said that dispute what general contractor didn't know was that every time he called Barry the call was recorded you know that hole this call may be recorded for quality assurance purposes that you get when you dial in well Barry never used his cell phone never initiated a call and so every time the general contractor called in it was recorded and archived every single time sure enough another couple of days go by and another automatic door opener goes down again Barry asked the general contractor if he's good with the rebuild gets confirmation removes the blown part installs the rebuild then takes a blown control board back to the shop and rebuilds it a new control board is 750 bucks for the rebuild Barry's charging six hundred dollars for a part that maybe costs 75 dollars to get back into shape the bid specified that non-warranty service was 125 dollars per hour for a minimum of four hours so tack on another 500 bucks for laborer and it takes maybe 45 minutes to install a new control board and dial it in so every control board replace basement was generating one thousand one hundred dollars there were 27 blown control board swaps in the first two months general contractor called in every single one of them and Barry got his verbal approval for each one if someone from Fancy Pants restaurant called in we gave them General Contractors number and said that we could only come and fix it if the general contractor was the one to call it in then Barry gets a call from daddy of Big Daddy wanting to know what this invoice for almost thirty thousand dollars is for Barry explains and a meeting is called Barry brings his lawyer and all copies of the sign off sheets as well as transcripts of every conversation he had with general contractor it becomes very apparent that general contractor effed up huge and that Barry had dotted every eye and crossed every T big daddy is glaring daggers at general contractor and basically tells Barry that if he wants to get paid he's going to have to sue for his money Barry smiles and slides his Ace across the table it's a contractor's lean against Big Daddy Fancy Pants restaurant and massive realty company the owners of the building here's the thing Fancy Pants was owned by internationally famous chef who makes his living getting very important people to invest in opening a new restaurant this is place where they go to be very important and bring their business contacts with them after a short time when the restaurant is the happening place in town the investors sell the place and cash out huge internationally famous chef sticks around helps with the transition and makes a percentage of the restaurant's profits for the use of his name he built an income stream with the investors money and the investors make a nice return only now with a lien on the place they can't sell it and these investors have rabid pit bulls as lawyers hell some of them are lawyers see you in court big daddy only you're not facing Barry's lawyer you're facing a whole new level of legal expertise have fun with that Barry got his revenge and then withdrew service based on the disputed invoice he's the only company allowed to service and install this brand of automatic door opener because he's a protected territory from the manufacturer and he does seven figures worth of business with them a year the only other companies anywhere nearby were warned off by the manufacturer who even relayed the fact that Big Daddy had called them directly looking for service and they referred Big Daddy to Barry Barry will definitely get paid as it's standard to hold back 10 percent of the payment to a construction company for a year and the holdback will definitely cover the invoice So Fancy Pants will pay Barry and then take it out of Big Daddy's hold back either way they'll Sue Big Daddy into dust or Force Big Daddy to cough up and settle the lien who knows what company Big Daddy picked up to cover the doors Barry has friends in the industry and warned them all about Big Daddy but there are always douchebag competitors and Barry didn't say a thing to them maybe big daddy is screwing over one of the competition and what hurts his competition helps Barry what makes this deliciously Pro Revenge do you think that maybe just maybe Barry who us Decades of experience in the industry might have had an electrician friend that could show him the electrical bid and that maybe just maybe Barry knew from the beginning that there was no provision for 120 volts in either package or that the washroom was too small or that general contractor a corner cutter would take the easy way out and hook the automatic door openers into the air curtain way to go Barry nicely played that was our slash Pro revenge and if you like this content check out my podcast where I published the exact same episodes also hit that subscribe button because I put out new Reddit videos every single day
Info
Channel: rSlash
Views: 376,907
Rating: undefined out of 5
Keywords: reddit, r/, rslash, r\, sub, subreddit, best of reddit, reddit top posts, top posts, top posts of all times, funniest posts, funny, comedy, funniest reddit posts, funny reddit posts, funny reddit, fails, cringe, r/prorevenge, pro revenge
Id: 45lFEXrRoo4
Channel Id: undefined
Length: 19min 41sec (1181 seconds)
Published: Fri May 06 2022
Related Videos
Note
Please note that this website is currently a work in progress! Lots of interesting data and statistics to come.