HOW IT'S MADE: The Glen Canyon Dam

Video Statistics and Information

Video
Captions Word Cloud
Reddit Comments
Captions
bordering on the vast space of the Navajo Reservation the dam site soon became the objective of a slowly growing army of construction experts and the machines of heavy construction brought new sounds to this land of the Navajo new highways were built to reach the dam site through Arizona and through Utah new highways through two states each ending at the rim of Glen Canyon Glen Canyon Dam a huge construction project bisected by a 700 foot deep canyon and no way to cross the only answer was a bridge a long high steel span to link the canyon rims construction of the bridge was soon underway the last steel beam by tradition bearing the American flag was lowered slowly into position on a hot August morning and within a few months the bridge was finished completing the world's highest steel arch bridge it was acclaimed the most beautiful bridge in America opened to traffic in 1959 with the opening of new highways in the new bridge tourists began coming to watch the construction of giant Glen Canyon Dam the guides point out that the 710 foot High Dam is part of a vast undertaking called the Colorado River storage project many large and small dams will be constructed on the tributaries of the Colorado but when Canyon Dam will be the key structure in this plan for expanded use of water throughout the upper basin States Glen Canyon dams role in the project will be to store great quantities of water to meet downstream commitments it will not provide irrigation directly but it's priceless reservoir will make possible increased use of far-distant upstream tributaries as a by-product valuable electrical energy will be carried over a federal backbone transmission system to meet the need of growing cities and industries to prepare the canyon to make it safe for workers below a group of daring men called high scalars had to comb the canyon walls removing loose rock drilling trusting to a slender line hanging from the canyon rim far above meanwhile at River level men with grills dynamite and mucking machines began to bite into the sandstone walls two tunnels each as wide as a house were cut through a half mile of rock to divert the river from its channel in February cold when the distant Mountain slept under a blanket of winter snow the low flows of the muddy Colorado slipped by the dam site this was the time to close the coffer dam and to move the river from its bed angrily the water fought to remain pounding digging driving the boulders before it but eventually the truckloads of broken rock closed the gap and the water began moving for the giant diversion tunnels the Colorado River felt the reins of man's control soon the warm spring winds shrank the distant snow banks and the new tunnels felt the full fury of the raging river high above the tunnels on the rock walls of the canyon men and machines began to cut the key waves huge notches extending from the rim to the river the concrete of the dam will be fitted into these key ways to anchor the giant structure into the canyon walls with the river bypassed and the keyways cut to the canyon floor power shovels and draglines began to clear the sand mud and gravel from the old riverbed the men of Glen Canyon prepared for their fourth year of building the dam remove the rock remove the sand remove the gravel laid down on the Aegis before man get down to the bedrock and wash it clean 137 feet below the river the sandstone was laid bare to the Sun ready to receive the massive concrete of Glen Canyon Dam midday at the construction site at the cofferdams in the foundation area and on the canyon rim a stillness falls as the men rest and prepare for the task ahead midday at the town of page two miles away lunchtime for the wives and families pages a city carved from the raw desert when the work of the big dam first began more than nine hundred trailers accommodate many of the construction workers and their families page was planned for people for people who want to live in a clean ordered community for people who want schools doctors stores and churches for people who will live here and operate the dam and power plant in years to come they shop in modern air-conditioned stores and they have created ways to use their leisure a land of free-flowing wind of the black brush the sagebrush and the dryland grass a town has grown where none had stood before a city shaped by the forces of nature sustained by the efforts of man at the dam site the foundation rock that had been laid bare and carefully cleaned was ready for the concrete soon to come during the years of excavation giant plants were built to process and supply each of the ingredients that would go into the concrete aggregate comprises the bulk of concrete this rock and sand are washed screened and sorted by a large plant six miles from the dam site the aggregate is stored on the rim of Glen Canyon to await delivery by underground conveyor belt to the mixing plant 188 miles south of the dam site a new cement plant has been built to convert the limestone and other minerals into three million barrels of cement for Glen Canyon Dam a truck loads and leaves this plant approximately every 40 minutes day and night pozzolan a natural cement like material is used in place of some of the cement to give the concrete more desirable qualities pozzolan is obtained from a volcanic deposit near Flagstaff there it is finely ground and trucked to the dam site even the water to be mixed with a concrete requires a plant a mammoth refrigeration plant the largest yet used in building a dam here ice is produced in vast quantities to be used in place of some of the water in the mix concrete the refrigeration plant also cools water to be pumped through to being embedded in the dam itself the cold water carries away chemical heat generated as the concrete Shores and the most important plant of all the mixing plant perched like a fortress on a ledge of the canyon this towering plant is as high as a 20-story building ingredients are fed into this plant where they are measured mixed chilled and tested to produce heavy wet concrete the final step is the Swift lowering of the concrete from the mixing planet of the Canyon great cables attached to moving towers on each rim swing the buckets to any spot in the dam or power plant On June 17 1960 everything lay in readiness for the first bucket of concrete a large crowd assembled on the high bridge to watch the operations far below almost four years had been spent in the canyon excavating building plants getting ready but all preparations were now at an end as the elaborate machinery that would feed concrete to the great dam was set in motion the Secretary of Interior had pulled the lanyard releasing the first 12 cubic yards of concrete onto the rock floor the first bucket first of over 400,000 to be mixed to the noisy clatter of a concrete plant and since sailing to the white barrier below that's our Edie they're like hey what's another half a bucket down go on a ball get down the dam is built in blocks that will be later sealed together with cement grout to make the dam a single solid concrete mass the biggest individual blocks are 70 feet wide and 220 feet long from the canyon rim the scene appears to have little activity an army of workmen virtually hidden in the Great Canyon swiftly the great buckets drop their loads of concrete and slowly the massive dam rises skyward as actors in the drama of the Colorado the workman in the canyon below now hold the stage but soon other men will have their turn men who now wait and prepare in a plant near Flagstaff men fabricate the penstocks giant steel pipes that will carry the cold clear water through the dam to drive the turbines and generators some of the penstocks sections weigh as much as 100 tons trucks carrying these to the dam site can travel only 15 miles an hour cities and industries in the Intermountain West wait for electrical energy that will come from Glen Canyon Dam farmers and ranchers in Colorado Wyoming Utah and New Mexico wait for irrigation projects made possible because Glen Canyon Dam and other storage units will control the upper Colorado River and in scenic Glen Canyon National Park Service Rangers prepare for the influx of visitors who will vote fish and swim in the blue waters behind the dam the Glen Canyon reservoir has been named Lake Powell in honor of John Wesley Powell Explorer scientist and early proponent of reclamation in the West as the waters rise in Lake Powell the narrow side canyons will become intriguing inlets of matchless beauty higher on the red cliffs the water will lap against rock formations now rarely reached by man a new hours come for Glen Canyon for the Colorado River and for the people who look to the river for the benefits it can bring the harsh sounds of drag lines and power shovels have echoed through the desert Canyon but they are heard no more now the roar of concrete mixers sandblasters and pumps fill the air but these two will shortly be gone soon the hum of generators will replace the sounds of construction in the deep gorge and Glen Canyon Dam will endure an important and noble venture for tomorrow
Info
Channel: DOCUMENTARY TUBE
Views: 964,164
Rating: 4.5239568 out of 5
Keywords: engineering, hydroelectric, make, building, generators, concrete
Id: c5mZGi0v5Fs
Channel Id: undefined
Length: 24min 49sec (1489 seconds)
Published: Mon Jul 27 2015
Related Videos
Note
Please note that this website is currently a work in progress! Lots of interesting data and statistics to come.