Heavy Equipment Assembly Lines Operating At Insane Levels

Video Statistics and Information

Video
Captions Word Cloud
Reddit Comments
Captions
welcome back to another video from lord gizmo today we're going to be looking at some of the most impressive cranes from around the world if you enjoy this type of content make sure to like this video to see more like it first up we have the lieber ltr 1220 a telescopic crane that has a 60 meter long telescopic boom for hoisting a 220 ton load at the height of 101 meters one of the most appealing features of this telescopic crawler crane is its capacity to self-erect each of the ltr cranes may be brought to the work site using a low loader and the center ballast cross carrier crawler and turntable are all placed without the need of an auxiliary crane as a result the ltr 1220 can be lined up to start its work in no time at all [Music] so [Music] [Music] the most challenging part of assembling any large crane is erecting the jib arm generally ballast counterweights are used to balance both sides of cranes the lr1600 has a 60 meter long boom but instead of ballast weights liber used one of its two 200 ton cranes the ltr-1220 it serves as a counterbalance this new concept has improved the process's efficiency and safety it also eliminates the need for balance transport and on-site handling these cranes unlike counterweights can be used for different purposes after erecting operations [Music] [Music] [Music] [Music] this is lock the tower europe's high skyscraper standing at nearly 430 meters its construction was next to impossible without lieber as this giant machine manufacturer had to construct four special tower cranes specifically for the construction of this building these cranes can raise items weighing up to 64 tons to heights of nearly 400 meters maintenance of these giants at such a height requires tremendous professionalism the service professional has to ascend 462 meters at such heights temperatures can get down to -32 degrees celsius with winds over 130 kilometers an hour proper work clothes are essential to defy the weather but for safety reasons maintenance tests can only be carried out in winds of up to 72 kilometers an hour thanks to lieber trained engineers and powerful cranes this 87-story tower got into shape in record time [Music] [Music] [Music] with a load capacity of 130 tons the hs 8130 hd duty cycle crawler crane proves its prowess in the deep foundation sector the hs series is intended for use in high speed dynamic applications deep foundation jobs utilizing a casing oscillator hydro mill slurry wall grab or dynamic soil compaction are typical applications additionally material handling encompasses the operation of grab or drag buckets as well as dredging special attention is given to performance and safety optimization the upper carriage is equipped with railing walkways and pedestals to ensure worker safety the access ladder is incorporated into the design of the superstructure this expedites the crane's mobilization on the job site [Music] [Music] [Music] the mark 88-4.1 has a compact maneuverable design and is therefore perfect for jobs in densely populated inner cities the mobile construction crane is frequently used as a taxi crane and is highly adaptable and absolutely made for short-term hoisting work it has a max lifting capacity of 8 000 kilograms with its 45 meter long boom the operator uses an elevated cab from a height of 30 meters the jib of the crane uses telescopic rods and cables its three section folding provides a very high overhead assembly so that only a little bit of space is needed for erecting [Music] this clip is of the journey of the t282c which starts out at the port of brisbane and continues its voyage all the way to north queensland where it is assembled by all of the parts coming from different parts of the world to optimize productivity and limit fuel consumption the t282c combines a high horsepower diesel engine with a electronic plus ac drive system it features a 3650 horsepower engine a nominal cargo capacity of 400 tons and a gross weight of 600 tons with the highest payload to empty vehicle weight ratio in its class the t282c hauls more for less to maximize [Music] profitability [Music] [Music] [Music] last but not least we have footage from a narrow alleyway in an old town in switzerland where the ltm 11 10-5 1110-5.1 is in action dismantling a large tower crane this all-rounder has compact dimensions and features like vario base that make it ideal for work in narrow city centers it has a 60 meter long telescopic boom and can haul up to 110 tons its rear outriggers have a two-stage design providing a wider support width than the front ones the crane has a wide range of driving stats providing significant benefits for driving on roads worldwide indeed it's an engineering marvel hey guys thanks for watching and we really hope that you enjoyed the video if you have any thoughts about what you just watched or have ideas for future videos comment them down below if you enjoyed what you just saw feel free to like and subscribe and don't forget to hit the notification bell too thanks for watching and we hope to catch you next time you
Info
Channel: Lord Gizmo
Views: 36,152
Rating: 4.92555 out of 5
Keywords: equipment, another level, next level tools, insane level, next level, heavy equipment, insane machines, construction equipment, heavy machines, insane factory machines, insane, at another level, heavy duty, amazing inventions, liebherr, liebherr r 9800, liebherr crane, liebherr mining, liebherr cranes, liebherr ehingen, liebherr tower crane, liebherr ltm 1650-8.1, lliebherr, liebherr ltm, lh60 liebherr, liebherr kran, liebherr a 913, liebherr bos 1900, liebherr nenzing
Id: wDt0ACti69w
Channel Id: undefined
Length: 15min 12sec (912 seconds)
Published: Mon May 31 2021
Related Videos
Note
Please note that this website is currently a work in progress! Lots of interesting data and statistics to come.