Taras drewniany na gruncie i słupach budowa krok po kroku

Video Statistics and Information

Video
Captions Word Cloud
Reddit Comments
Captions
A place for a wooden terrace Before the terrace was made, the roof was prepared (available movie in the Video catalog) Designation of points for concrete columns Poles every 1 meter as support for joists, joists every 50 centimeters Drilling wells with a drill A total of 58 holes for concrete columns The diesel drilling rig fi 200mm A hill of land was formed from the holes Concrete B20 was used for making pillars As a formwork, it used a 20 x 300 cm Casto timber formwork, which was cut into appropriate pieces Pour B20 concrete Keep the drop, i.e. 1 m long, the difference in the order of 1 cm. Leveling is very important After the poles were prepared, the boards were painted with protective soil and set aside for drying We buy agrotextile min. 90g Disperse the agrowextile in the place of the terrace Cut the place for the poles and sprinkle with stone Stone / gravel: for adding agrotextile Impregnation of joists Impregnation and painting with color of terrace boards from Siberian larch Sadolin Base was used for impregnation Sadolin Superdeck TEK color was used for painting with color Before applying the oil, the boards should be thoroughly cleaned of old dirt, especially in grooves Spread the oil with a thick, short-haired brush We put 2 layers of Sadolin Base on the joists and the bottom layer of the boards, i.e. those elements that will not be visible We put 1 layer of soil on visible elements, i.e. those that were supposed to have a given color We impregnate Sadolin Superdeck color TEK. We apply 2 layers of finishing oil. We put the second layer after placing the boards Joints connecting the joist with concrete 8x140 + concrete drill 8x200 Join the joists with the washer and concrete with the use of dowels (hammer them in, do not screw them on) Place rubber washers on concrete foundations They are designed to separate the joist from the concrete, so that the wood does not rot from the ground Additionally, they dampen the terrace and slightly level and drain water If we plan lighting, we distribute the cable The whole is covered with stone After impregnation and painting, the wood must dry Installation of decking boards starts from laying the first board perpendicular to the building In the first step, the masking board was also mounted The boards were arranged in the order in which they were laid On the joists, we arrange the boards with a distance of 5 mm between the boards using crosses We fasten the boards with stainless steel screws at a distance of 2 cm from the edge, 2 screws for each joist Screws 4.5x60 stainless. 980 screws were used It is good to stock up for a squeeze for boards A hand saw was used to cut the wood Finish by the pole Before screwing in the screws, drill the board and joist with a bit fi3 Light diameter 1mm smaller than the screw When screwing the screws, the screwdriver turns slowly The lights were installed before final tightening of the cover boards 9 eyelets were installed The final effect on the film and close-ups of finishes. I invite you to like and subscribe :-)
Info
Channel: Home Ideas
Views: 3,246,969
Rating: undefined out of 5
Keywords: taras drewniany, na betonie, na słupach, na gruncie, taras z drewna, modrzew, syberyjski, deska tarasowa, salon w ogrodzie, legary mocowanie, światło na tarasie, montaż deski tarasowej, deck on ground, Attach rim joists, build a deck on a slope, Terraza de madera, Holzterrasse, ウッドデッキ, concrete piers, Terrasse en Bois, spax
Id: 5EiLSnRng9A
Channel Id: undefined
Length: 8min 52sec (532 seconds)
Published: Wed Aug 22 2018