Slab-on-Grade Foundation With Concrete Stem Wall and Under Slab Insulation

Video Statistics and Information

Video
Captions Word Cloud
Reddit Comments
Captions
[Music] first the site is excavated and rebar is placed according to local code [Music] formwork is placed and the footing and stem wall are poured with anchor bolts placed according to local code next a four inch layer of gravel is placed to facilitate drainage underneath the slab and to act as a capillary break it also allows the removal of radon from beneath the slab if radon is present lengths of extruded polystyrene are placed on the interior perimeter of the stem wall to act as the isolation material and to provide a thermal break for the slab extruded polystyrene insulation is placed on top of the gravel bed followed by a six mil polyethylene vapor retarder note that the edges should extend to the exterior edge of the stem wall then the slab is poured still seal is placed at the edge of the slab followed by the termite shield and another layer of silsil then the stud walls are built on the outside wall a bead of sealant is used to seal the bottom of the weather barrier to the termite shield [Music] furring strips are attached through the exterior insulation back to the wall studs these provide a ventilation cavity for the exterior siding the exterior siding is applied to the furnace trips lastly the exterior trench is filled with low permeability soil
Info
Channel: International Association of Certified Home Inspectors (InterNACHI)
Views: 264,238
Rating: undefined out of 5
Keywords: International association of certified home inspectors, InterNACHI, NACHI, become a home inspector, home inspection training, home inspection education, gromicko, slab-on-grade, concrete floor
Id: 0tSg-LbNRrk
Channel Id: undefined
Length: 1min 49sec (109 seconds)
Published: Wed Mar 10 2021
Related Videos
Note
Please note that this website is currently a work in progress! Lots of interesting data and statistics to come.