REPLACING SHINGLE ROOF step by step

Video Statistics and Information

Video
Captions Word Cloud
Reddit Comments
Captions
sure I have a typical set up on the job site with a concrete driveway 16 concrete driveway protected with a plastic to avoid an spills and a debris here we have a signs of protocol failure thank you we're not mailed properly buckling previous signs onto the face of those you do with preorder the materials get them on the roof early so we have everything on the jobsite prior to starting the project here we have a crew working on removing all of the existing roof system after removing all the debris they go into checking the would subside making sure the decking rafters trusses are okay and will support a new roof same application event view first the shingles being stripped remove the nails and then we get to remove all of the underlayment to see the decking here we're working on preparation of the flashing which is located against the wall every penetrations and the wall transition most critical areas in the roof and foremost attention to focus on after removing goes all the bells under women open L 13 from the day the flashings from relapsed x-pipes is being removed and we replace it with new basically every item on the rule is replaced with new question counter fledging penetrations the question gets removed here we can remove all of existing flashings locate on throw matter on the road we're working on the face of the chimney cleaning in the moving of the glistening L flashing looking for any potential damages the Starkville Viking removing all of the degrees from underneath and the top of a clean up clean up clean up very important item we have already ended the briefs falling to the ground to prevent any damages to the surrounding AC unit full pump keeps running around an address once again focus a lot on protection of the surrounding of the area trying to catch every possible debris we can to provide it avoid any potential problem here we have AC unit over whether to supply wood to avoid any damages to the outside of the unit and tail or the great point inside the unit it might cause problems down the road after removing all the papers we were able to inspect the nailing pattern on existing plywood as we can see in this case is perfectly fine every three to four inches as per version of the crow what it means suppose it is a very good job or they build a house we have areas of I would just illuminating separating decision is made to be replaced within your 5/8 CDX plywood at this point removing the boards here we are on process of installation of the new 5/8 EDX why work on the top of the existing owner requested specifically is condition to be done we wanted to reinforce this room and two layers of like ink applied on the past each other and they are properly to the rafters definitely will spring this material amenda all the nails used for redecorating have a pad like a screw will be more durable to the pulling forces from the wind each nails about to water as long with at least 16 to 20 rings which work with a scoop and hold the nail better whatever we see any potential damage to the decking even if that's covered with another one however we replace every piece that it's not structurally sound I rather termite damage mounting the existing gutter will probably preserve the gutter we're taking extra steps to remove it in one piece we have a radish fascia on the corner another placement of the wood is necessary and in order to hold to place the wood the garden has to come off to provide us with adequate space you insert a saw and remove rotted wood that is 2 to 3 from the corner to support we have a condition where the roof is very tight and you are petite and when the house is go without the best solution so we're cutting existing stucco and we replace the flashing located underneath right now we starting application of the secondary water resistant sheet has recommended for insurance industry standards to obtain additional discount from the premium it depends on each insurance a little bit different application of the secondary water resistance around the rope limitations to lower potential risk of any problems in case of the project event of destroy the roof system every penetration gets additional seal with a sulphate irritation around the base once keeps activated and the second layer of fascia covers the strip's they start using during the temperatures summer canisters with the wood and become part of the woods after this operation is completed the first layer of underlayment will get applied in the fastener with the ancient quarter-inch ink nails once again those special names which is constructed like a street type the Rings to prevent any pulling of horses we process all installation of the first layer of defense actually second in this case because the cell fatigue tapes were the first then the black belt secure it with the nails and hand caps as the secondary of water resistance also and then another position in case of the tile installation will get installed directly on the top for the hot zone
Info
Channel: Allied Roofing & Sheet Metal, Inc.
Views: 896,733
Rating: 4.5149198 out of 5
Keywords: replacing roof, roof removal, removing roof, shingle roof, new roof, roof florida, Allied, Roofing, and, sheet, metal, reviews, testimonial, video, roof, allied, roofing, florida, Allied Roofing, Fort Lauderdale Florida, Roofing Contractor, Fort Lauderdale Roofers, Repair, Design, Metal, Florida (US State), Cleaning, Installation, Construction, shingle, tiles, tile, roofing contractor florida, roofer fort lauderdale
Id: mbawZCQQPBw
Channel Id: undefined
Length: 9min 54sec (594 seconds)
Published: Thu Aug 02 2012