High-Speed Trains: The Pursuit of Speed and Technical Excellence | FD Engineering

Video Statistics and Information

Video
Captions Word Cloud
Reddit Comments
Captions
5748 kmph it's the new world record on Rails a jet takes off at 300 km an hour we're now doing almost twice that the Quest for super trains entered a new phase in the 1950s when locomotives went from 140 kmph to the Mad speed of 330 kmph with equipment pushed to its limits and conductors facing unknown [Music] risks the design techniques of the time made it impossible to predict what would happen thanks to 3D reconstructions we will see the impact of innovative technology and construction secrets that enabled Engineers to break records that were considered unattainable [Music] the tgv runs with a helicopter turbine we had to invent completely new tools from generation to generation trains were going faster and faster there were some full hearty projects yet also a revolutionary engine the aerot train hovers thanks to its air cushion so it almost completely eliminates friction from the first electric locomotives pushed to their limits to agv trains approaching 600 kmph via the tgv and the aot train with its exceptional propulsion this is the incredible story of The Race For Speed on [Music] [Music] Rails [Music] it all starts in the mid1 1950s in postwar France the mood is optimistic and speed is all the rage and the speed of trains in particular however the steam locomotives of the 50s can't go beyond 140 kmph since to reach this speed the heat in the furnace must exceed 800° c a temperature obtained thanks to the presence of multiple pipes in the water tank the more tubes there are the more heating surface there is so the more steam can be reled 1 lit of cold water produces 173 L of steam this Vapor exerts pressure on a piston the Piston creates a back and forth movement on a connecting rod the connecting rod attached to a wheel will make the engine go faster and faster trains could now run up to 160 km hour yet to exceed this speed you have to rethink the train and forget about Co 5 engines with this in mind the French Engineers are looking for inspiration from the Paris Metro and its electrical technology we immediately saw that electricity could produce much higher power at much lower costs in 1952 the sncf France's state run Railway decides to Electrify the track between Paris and Leon a power station will provide the energy the train needs a 1,500 volt current is thus transmitted in a copper wire above the railway track called a [Music] cenry the faster a train goes the tighter the cenery must be to allow the train to draw sufficient electricity the rigidity of the copper wire is essential since it has to withstand the pressure exerted by a key part of the train it's the Pantagraph a bow likee structure located on top of the lead car which is responsible for collecting the electric current The Pantagraph is a revolutionary invention 70 years later it is still present on the most recent high-speed trains it still weighs as much as ever nearly 200 kg in the beginning its details are a well kept secret even today several parts are still protected by patents such as its rate of air resistance The Pantagraph is a bit like an airplane wing it pushes upwards in spite of the pressure caused by the speed the composition of the bow prevents it from being torn off its structure and attachments constitute an integrate piece of engineering however at this level of speed there's a problem by lifting the copper wire several cenm it would only take a few minutes for the bow to be cut in half under the effect of the speed the engineers will have to find a solution the cry was laid out in zigzag form so that it can glide Across The Pantagraph if the line was straight it would have the effect of a saw and then after 1 kilm your pantograph would be cut into two a bow is 70 or 65 cm wide you have to use its whole length for the zigzag of the kinary which may then Glide sideways for several dozen centimeters once the contact is made the current is sent to a Transformer and then to the motors on the bogeys huge cards with wheels the electric current will thus directly feed the motors it's a system that promises unprecedented power enabling trains to reach levels of speed never before attained two manufacturers are chosen for the job alstor and Schneider that meant two locomotives each with a different technology the BB type and the CC Schneider's BB has four wheels per bogey alom CC has six which gives it better grip at high speed both trains will be complete Innovation on the railway market and are intended to become showpieces of French engineering however there's no thought of chasing records yet to inaugurate the new era on February 21st 1954 the engineers will perform a test on the line between Paris and Leon the CC will go at full speed in order to observe Its [Music] Behavior the train which was designed to run at 160 kmph actually ran at 243 kmph 243 kmph it's a speed record the success of this test with totally standard equipment will highly motivate the engineers now one of them fernan nuvon is proposing the greatest Railway challenge of the time to launch the two new trains at full speed while giving them a power never before developed the question was where can we stage a test at such speeds and as it happens in the southwest there's a line which runs perfectly straight for 40 km once the trajectory has been defined some modifications are made to push the engines to the maximum of their possibilities the conductivity of the cenry through which the current passes is increased to 2,000 volts instead of the 1,500 which are the norm on the railway Network this way the engines will develop powers of 8 megaw whereas they were designed for three or four that's more than double the design specifications nobody knows yet what problems may occur Beyond 250 kmph however the engineers are [Music] imaginative the windshields of the locomotives were fitted with wire mesh there was a fear of bird strikes at 300 km/ hour this might cause severe damage to the driver's cabin with such high starting power it was also fear that during the first few meters it would be difficult for the conductor to control the power of the engines and prevent the wheels from slipping so the manufacturers decided to create a special device to provide an anti- good [Music] system that's why there's sand on board the engines to increase grip the sand prevents slippage when starting up it's still used on today's engines they have tanks that open to pour out the necessary amount of sand a March 28th 1955 the aom CC sets off on the 40 km of straight line an engine equipped with the latest technology it's hoped that it will reach a speed of 300 km/ hour or more if possible soon the CC reaches the record speed of the previous year 243 kmph and the locomotive is ready to go much faster the symbolic barrier of 300 kmph has been reached yet at such a performance the technology is being stretch to its limits in particular the cadry is showing worrying signs the contact wire and The Pantagraph went like this electricity ared in all directions the bow began to melt and as the pantograph was almost destroyed they took emergency measures and lowered it the locomotive pulverizes 243 k km/ hour they had gone at over 300 kmph yet the order is given to stop the train as soon as possible the CC could have gone even faster but it might also go off the rails at any moment the men on board are in danger a seemingly curious order is given to the engineers on the train they were told to open all Windows to allow air to get in and to decelerate the whole thing there was no question at the time of raking 331 km per hour we just didn't know how to do it today engines allow for testing emergency stops at such speeds the 390 tons of the latest trains will stop after 3,000 M the CC only stopped after 10,000 m and there was severe damage to the engine the CC had destroyed its transmission system and melted its Pantagraph it had reached the limits of feasibility the CC had broken the speed record yet when it arrives at the platform the feat is not made public the top brass of the sncf has issued a directive that the results shall not be communicated before the second day and the performance of Schneider's BB train there's fear that one of the two engines will be significantly less efficient than its competitor the financial Stakes for both companies are colossal state orders for new trains would ensure business for years the next day March 29th 1955 it's the turn of schneiders BB to attempt the world record after a few minutes the train reach is a maximum speed of 331 kmph on arrival the results of the two tests are finally announced surprisingly it's the same speed for the BB and the CC it's a figure that satisfies everyone but it's not true the CC never reached 331 kmph but stopped at 320 it could have gone faster but for safety reasons it was decided to may do with this speed so the record in fact properly belongs to Schneider once more the Schneider BB achieved this record with a handicap compared to the Alam train the day after the CC's performance the temperature had risen considerably on the day of the BB's run it was much [Music] warmer the difference of almost 10° C causes a noticeable relaxation of the CER a relaxed C poses the risk of considerable undulation when The Pantagraph exerts pressure from below and that hinders current collection without these power cuts the BB might have gone well beyond 331 kmph yet its performance close to the alom engine suits everyone and the news of a world record set by two different engines resonates across borders it made news headlines Regional as well as National and even in the international press 331 kilm per hour was the absolute world speed record for trains at the time the double feed set an example for all countries looking for Solutions in future rail traffic the manufacturers alstor and Schneider would charge a high price for their knoow as the World Market for trains offered spectacular possibilities [Music] but these exploits also wet the appetite of other companies 2 years after the Dual speed record an engine straight out of the future sees the light of day the ambition of its makers to shatter the state financed record by surpassing 350 kmph it's called The Arrow train this exception invention with its Unique Mechanics which makes conventional trains look totally outdated is the brain chart of Jean betan an ingenious inventor in the field of Aeronautics a daring entrepreneur and a major player in advanced post-war research his latest project the aot train is a kind of rocket propelled horizontally by a system quite different from [Music] trains to move at high speed the aerot TR blows air under itself it then lifts up by a few centim thanks to its air cushion and thus almost completely avoids friction it's a technology that has dispensed with the wheel after thousands of years it was a gigantic step the aerrow train runs on an inverted t-shaped rail a turbine drives fans the raise the whole configuration the aot train then rests on a real air cushion a second helicopter turbine positioned at the rear drives a propeller of 2.4 m in diameter composed of seven blades you just have to push and on its cushion of air it will move at an extraordinary speed there is still air resistance but no more rolling resistance however it takes another 10 years of studies before the ultimate prototype of the aot train enters the race demonstrating to the world that it's the future of high-speed transport on January 22nd 1969 Jean betan launches his horizontal rocket on its concrete rail the peak speed obtained as announced by the engineer seemed incredible 422 kmph nearly 100 km more than the 331 kmph of the previous record while Jean batan continues to work on the Prototype of his aot train the engineers of the classic Railway are embarking on a new project it has to be revolutionary as well with a new design a top speed never before reached yet inspired by the aot train in its motorization the principle of the aerot train is adapted the train will produce its own energy without the help of a cenry inside the engine a gas powerered turbine will activate an alternator which in turn will create electricity which then will feed the motors in the Bogies this new system will allow trains to run even faster and to break the existing speed records the tgv is born tgv tgv simply means highspeed turbo train the challenge for the railway Engineers is set to demonstrate the level of Technology achieved by surpassing the existing record with the highest speed ever [Music] attained but to do so they will have to transform the old trains that have served their purpose by new engines adapted to highspeed for the first time a train isn't pulled by a locomotive but made up of two motorized cars at each end that can run in either direction this is extremely important a train that is reversible allows us to use it much better if trains go faster traffic on the tracks will intensify therefore it's necessary to be able to save time on shunting in stations thanks to the new design trains can leave in both directions and that's a definite plus compared to the aor train which can only run one way the front and rear cars of the tgv also undergo an outward transformation since new levels of speed open a new field of concern its aerodynamics or in short [Applause] drag how can the previous speed record be broken when the design of the classic locomotives acts like a break air resistance is catastrophic their front is worse than the wall as it repels the air it slows down the Train the result is a waste of electrical energy energ air resistance is a predominant factor in energy consumption better aerodynamics would allow power consumption to be reduced by 20% the aim is to prevent the air from impacting the shape you have in mind as much as possible the best examples of the time are the designs of cars their Bodywork takes on new aerodynamic shapes that's why alstom the builder of the future tgv is going to call on the man who designed the latest Porsches that is Jack cooper cooper is going to transform the shape of the Train the point of the leading car is considerably lengthened it's a revolution in Railways but an outright necessity so as not to be slowed down by the air mass when we swim we fight against a mass and we make efforts to move forward against that mass with air it's exactly the same as soon as you advance you create turbulence and the effect of that turbulence is that it holds the object back yet if the air can be better pierced by the front end of the train it can still get caught between the cars as was the case with previous trains so how do you improve a train to break a speed record what Transformations must be applied so that the train can penetrate the opaque mass of air you just have to imagine another Revolution and this one will concern the bogeys those massive carriages comprising the axles and the wheels under the cars carrying the passengers they are relocated to fit between the carriages and are hooked up by a cylinder as a result the train now looks like one long tube the air no longer has any points of attack and this design also offers a huge Advantage from a safety point of view experience has shown that when a train derails the cars stay firmly attached to each other and this solidity prevents it from settling down when the Bogies were spread out under the trains it was enough for the head end of the train to derail so that the following cars would take completely random paths with the Bogies between the cars the train becomes a single unit and the chances of them going completely off the rails are almost nil fewer Bogies in the train also mean that its overall weight can be reduced by several tens of tons but if the tgv is going to break all speed records the driver too to needs extra help in high-speed trains the driver no longer has time to see the signals so we had to invent another system on tgvs sensors are placed in front of the first axle and constantly read the speed at which the train is allowed to travel on today's high-speed lines it's still this procedure that enables the driver to keep the authorized speed oh now this we have a safety system to alert the driver when he's going too fast and if it doesn't get a reaction it automatically activates a device that will stop the train all these Innovations are in place to ensure a smooth attempt at the world speed record on December 8th 1972 tgv 01 sets off on the same track as the previous [Applause] trains in the train a wagon is filled with high-tech that analyzes its performance in real time well the engineers scrutinize the data on the Train's Behavior All Eyes Are glued on the speed [Music] dial 318 kmph a promising start if the helicopter turbine can be developed just a little more the engineers think that they will reach the four 420 kmph of the aerot train their company now has a potential repost to The Craze generated by Jean Ban's engine alas this is 1973 a year of worldwide repercussions which will condemn the future of the aerot train and the TG V1 the oil crisis causes a worldwide upheaval the price for a barrel of crude explodes and the helicopter turbines in the aerot train and the tgv are big fuel consumers so in the end this technique was a failure the tgv project as well as the aot train are shed it killed the aerot train it killed my father he died a few months later yet during all these years the aot train have made the conventional railroad seem like a thing of the past and now there's another means of electric transport it's the shinan Zen the new star of Japan's Railways running at a commercial speed that's remarkable at the time 210 kmph but the shinkansen is not comparable to the French trains because it's a shuttle with magnetic levitation the cars lift thanks to powerful magnets however this vision of modern transport adds to the image of the train as being hopelessly outmoded a minister at the time said the train is [Music] finished but the French Engineers are determined to take up the challenge and to strike a big blow to reverse the trend a lot of Engineers went to see what was being done in Japan with the shanen system and that helped a lot to broaden views since on December 21st 1971 the Japanese train reaches 517 kmph an incredible speed yet it's achieved on a special monal track while in France tracks have to accommodate freight trains and there even still sections for classic trains it's evident however that the race for Speed is now run on a worldwide scale and so new technologies are called for to compete in the race it takes nothing left than a brand new train however it must comply with two requirements it has to be 100% electric so that it doesn't depend on Rising oil prices and it must be able to run at very high speeds every day yet the engineers don't have to look far to find the answer all it needs is the tgv with a new formula without its helicopter turbine and re-equipped with a Pantagraph in other words a tgv 2.0 it's the one we know today a train imagined almost 50 years ago yet to run it at 250 km/ every day there is an [Music] obligation there has to be a difference of 150 to 200 kmph between the record speed of trains and the commercial speed if you want to train the runs comfortably at 260 kmph and well with its safety margins you have to prove that the train can go over 300 80 kmph without any problems the margin is required to reassure not only the officials but also future passengers so once again the race is on the bar is set at 100 m/s the project is christened tgv 100 to prepare for the new speed record not only will the train be profoundly modified but the track too since the electric current coming from the power stations is going to jump from the traditional 1,500 to 25,000 volts to guarantee such a powerful electric current all along the line you have to build substations at a distance of 50 km these small bases will adapt and reduce the grow power sent by the Central Station for the high-speed line between Paris and Leon control and management of the substations is done from Paris here they check check that the intensity of the power supply from the small copper wire is [Music] constant the konry receives a current 20 times more powerful than before but it also must be adapted to the specific conditions of a record run because the engineers anticipate a problem The Pantagraph by pressing on the konry at high speeds will create a ripple in the copper wire it's a phenomenon dreaded by engine ear if the Pantagraph catches up with the undulation it will lose contact with the copper wire and only hit it intermittently if you tear off the catry it means disaster so how do you make the cenry lift as little as possible and stay in constant contact with the Pantagraph on a high speeded line the catry is stretched to 2,600 Deon Newton that's almost twice the tension on a conventional line the counterweights on the masts are increased to further stiffen the structure that holds the cenry an indispensable process the infrastructure on the ground is modified too since the old 30m rails cause a shock each time the train passes over a w the whole system is therefore [Music] redesigned we now manufacture rails that are almost 300 M long and are delivered by special trains these bars are assembled using a special technique they're welded with [Music] aluminum the result is a rail without any intermediate mechanical joint the disadvantage of extremely long rails is that when temperatures rise the tend to bend upwards along their entire length so we chose very heavy rails weighing 60 kg per meter so they won't left with a Target speed of 380 kmph the infrastructure around the train has been rethought to correspond to the laws of physics yet no rail bound train has ever approached the speed of the record envisaged it's a leap into the unknown the whole country has its eyes riveted on the record attempt it's like launching a rocket in the horizontal the tension mounts in the car behind the driver there are Engineers to observe and retrieve the information provided by the train itself of course the train was loaded with sensors as during all the previous runs on February the 26th 1981 the tgv 100 gets rolling for conductor jacqu Reese going for the 380 kilm per hour is beyond anything he's done before in the cabin you have a threshold at 170 where you can see that the Train's accelerating then you have another one at 210 and again at 280 however Jack Ruiz is not alone engineers and managers are present to assist the driver only if on the photos they tell me I look tense but when you're going that fast you can't let yourself be distracted by people in the [Music] cabin 120 [Music] seconds 372 km per hour 73 74 75 76 77 78 79 80 we've reached 380 kmph 380 km per hour the world record of 1955 is beaten but they can't go any faster due to the force of the Airstream The Pantagraph lifts off dangerously from the train pushing the catry much too high we already had a lift of more than 21 cm so we stopped at 380 the limits of the tgv 100 have been reached yet the performance is unprecedented with a train and installations that will be used in everyday traffic it's state-of-the-art technology at the service of passengers this train is not a Utopia it's the very train that will race into the future the interesting aspect was that we were breaking records with commercial equipment the world record makes the tgv a worldwide success and the lines spread all over France the high-speed train becomes the new icon of the Railway passengers are eager to board the Orange train but like all records this one too will be be hunted down 7 years later on May the 1st 1988 the German manufacturer seens sends its IC between Hanover and verburg at 406 kmph France loses its title it's a blow to the nation's Pride at the manufacturer alstom there is only one goal now that of of overtaking the Germans all forces are going to focus on this objective the commercial future of one of the jewels of French technology is at [Music] stake they must strike hard this time so as not to be overtaken again a few months later the aim is to crush any hopes of being on an equal footing with the French Railway industry the envisaged speed must kill off all competition for a long time to come there we were hoping to break the 500 Mark 500 km an hour a mythical barrier yet how are the engineers going to achieve this feat will they be able to improve the rigidity of the cenry so that it won't be torn at over 380 kmph and what are the new constraints at that speed at 600 kmph an air bus is well into again they have to push the limits of the train and work on its body of Steel since during the previous record at 380 kmph the sides of the train began to erode the bay windows protruded slightly from the sheet metal so the higher the speed the more they were exposed to the air rush and we're talking about sheet metal just a few minut thick with an imperfect air flow everything that protrudes is GED away so when the Train's underway there's a continuous abrasion of 3 to 4 hours the effect is a real break on the train so the fuselage has to be perfected down to the last millimeter for the first time rubber membranes are Place between the cars the designers work on the aerodynamics of the first car but also on the tail end of the train so that the air will flow without too much rupture metal Shields are placed on the bogis to prevent the air from getting inside the diameter of the wheels which is traditionally 920 mm is increased to gain speed on top of the Train The Pantagraph is put on a firm suspension so as not to lift the cenry as happened during the 1981 record when the copper wire been pushed up about 20 cm it's tighten once again to ensure the closest possible contact with the bow but it's not only the train that is modified the infrastructure is also adapted the line is secure by 2 to 3 m high fences all along its length to prevent accidents involving animals crossing the [Music] tracks game struck by a tgv at 300 kilm per hour causes a lot of damage but fences may not be enough there's also surveillance along the tracks there are some hunters and hunting federations with whom we have Partnerships who will hunt game along the line or try to scare it away everything's ready for the record but before they invite the Press from all over the world a number of high-speed tests will be performed several times the train approaches the 500 Mark we were gradually increasing the speed and each time we'd monitor all the data to check that we were still within a safe margin then on May 18th 1990 we told the top brass okay we can go the public holds its breath as the attempt is covered live on television are the engineers going to win their bet and exceed 500 kmph on Rails nobody has ever done it suspense is total speed 494 passing vendom station in a few seconds passing vendom station speed 4951 just a few kilm per hour away from the magic 500 yet anything can still happen the catry May rip the Pantagraph may be torn Away by the speed the engineers on board scrutinize the reactions recorded by the sensors anxiety and excitement become one until the delivery 500 54 15 515 point something I'll read out later cut all tractions we're watching it's not over [Music] yet after being held for 2 years by the Germans France recovers the rail speed record on May 18th [Music] 1990 the German interlude aart France has held the world record for the past 36 years the tgb brand has reestablished itself and is exported all over the world 16 years will pass until in 2006 the railway Engineers roll up their sleeves once again France's State Railway is preparing the opening of a new line between Paris and Strasburg a new speed record on this track will give it an exceptional [Music] boost the new track offers 200 km at high speed with a straight section of more than 40 km and bends with comfort large radi the v150 project for 150 m/s has been born and again there'll be a new version of the tgv a real super Trin it's the AG the alom high-speed train with new motorization a rotor that rotates inside the engine and drives the wheels the agv engine weighs 3/4 of a ton and consists of two parts there's a stator made of sheet metal inside of which a motor winding receives the electric current in its Center there is a rotor made of an assembly of sheet metal and Cobalt magnets providing a magnetic force of exceptional Dimensions the stator turns the rotor the power thus generated is phenomenal for a motor classified as light but there's another special feature there isn't only a motor of the head and the tail of the train there's also one on each of the Bogies between the cars but this creates its own problems all metal tools were banned from the production lines because the tiniest key or any Hammer would immediately stick to the magnets the technicians had enormous difficulties mounting these motors the power of the engine is considerable theoretically the train can approach 600 kmph its eight engines are equivalent to 8,000 cars as for the outward design the AG is given an even more rounded shape we were approaching the sphere of aviation technology yet of more than 500 kmph there are new problems like strong Crosswinds they can tip up to 80% of the weight of the train to one [Music] side Crosswinds meeting too square of shape even if it's tapered will tend to cause much more lift so that's why we rounded the corners even more at the front the wind shield also becomes flush for better penetration of the air and in the Bodywork the engineers have H hidden over 600 sensors to record the Train's Behavior there are even miniature recorders on the wheels during the first tests the train goes over 500 kmph but then the hub caps covering the sensors give way at this speed they're simply torn off by the Airstream so the manufacturer decides to put thicker covers on the sensors yet it's the covers that cause a real Panic during a test run 5 days prior to the date set for the record attempt on March 29th 2007 the Press is invited aboard the agv to spread word on the comfort of traveling at 500 km per hour when we reached 56 kmph we heard a phenomenal noise which of course scared everyone it's caused by one of the hub caps that came off the wheel people were clinging to their seats thinking my God what's happening the train performs an emergency stop and this time it takes a mere 3 km to stop instead of 10 it's a new record but one that was never meant to be set for the first time in history a train has made a stop of more than 500 kmph but it proves that the train can cope with the most unexp expected situations in less than 3 months 40 tests are carried out gradually increasing the speed on April the 2nd 2007 the train even reaches 568 kmph an incredible speed that takes Everyone by surprise nobody imagined that the train might go that fast during the tests even the plane charted to take pictures was not fast enough to keep up with the train the plane had to fly at low altitude so its speed was limited and in this case the train was going faster than the plane all the indicators give the green light the next day the French and the international media follow the world speed record attempt live on TV will the train exceed the 515 kmph of the 1990 record it's 1: p.m. the train leaves from the town of prony in the direction of Noni Paris after 10 km the AG begins to accelerate in Earnest fed by the electrical voltage sent to the cenry from this point onwards the normal voltage of 25,000 volts had been increased to 31,000 volts to provide additional power 6,000 volts more that's a 25% rise in the power sent to the copper wire here we go initial voltage 31.2 [Music] [Applause] KV go to 360 360 correct 710 a 29.9 KV the rigidity of the cenry brought about by the counterweights on the masts has been increased by 50% to withstand the wave generated by the bow you can't jump from 2 tons to 4 tons that would be too abrupt we stretch to 2.8 tons then to 3 tons so that we have Progressive tension and approach the record Zone with a tension of 4 T the train is a full power but if the speed is too high the train will derail there was a succession of Curves with ever larger radi in the first curve we could run at 350 km an hour we'd seem that up to 350 all would go well but at 355 the train would lean over sideways and derail it takes Eric pack just 10 minutes to reach the speed of the previous record from [Music] 1990 55.3 km/ hour and the speed is getting higher and [Music] higher 13 minutes 5748 kmph or almost 160 m/s let attention all after control and validation the official speed reached during our run is 5748 kmph 17 years after the 1990 exploits the third generation tgv exceeds the previous record by 59 kmph it's almost half the speed of sound the commercial speed with passengers can therefore be pushed to 320 kmph on a daily basis today we're driving at speeds that were World Records not so long ago exceeding 574 kmph has become the yard stick for any country when attempting a record Japan has achieved this by driving it over 600 kmph however on Rails that can only support the shinan Zen yet there are other nations ready to enter the race the Chinese would love to take this record away from us let's wait and see the Americans and their brilliant inventor Elon Musk are working on it with an incredible concept the hyperloop the passengers will sit in a capsule and the cylindrical train will move in a long vacuum tube thanks to a levitation System created by powerful magnets the capsule will be hovering without friction and without air resistance so that nothing can hinder the shuttle's progress with a powerful electric motor it could reach speeds unimaginable a few years ago and exceed 1,000 km per hour but this is still only a concept and it has met with considerable skepticism maybe I'm a bit harsh but for me it's a PR how can you drive a vehicle at an extremely high speed in a vacuum tube without running into a great number of problems then there's the psychological side imagine a passenger locked up in a vacuum tube for 10 20 30 minutes on end the other problem one already encountered by Jean Ban's aerot train is the prohibitive cost of the infrastructure for the hyperloop like the aot train these systems require that whole urban areas be flat to allow them access to City centers whereas the tgv is able to run on tracks that have been around for two [Music] centuries a new speed record reaching 650 or 700 kmph would mean the commercial trains could run at 380 or even 400 kmph yet at this level the budget would [Music] explode the faster we go the more expensive it gets to manufacture and maintain the cars costs for going from 320 to 380 kmph would quadruple for the time being the race for Speed is taking a [Music] break it will be many years before Engineers will work on a new record these days ecological aspects call for moderation and demand is focused on passenger comfort from the first locomotives running on electricity like the CC 71o to the latest double-decker tgv trains and the incredible Arrow Train The Race For Speed on Rails has helped to develop a knowhow that is unique and is exported all over the world the tgv 4.0 planned for the next decade will be a synthesis of all the technological innovations implemented over the past 50 years comfort of Transport Silent Running within the cars a low carbon footprint 5G connectivity everything is combined to make this train the new state-of-the-art reference for rail travel the Japanese with their Mev rocket exceeded 603 kmph for about 10 seconds a new new world record for a levitating train thanks to powerful magnets the tgv still holds the record for a train that can run on Rails which are decades old yet there's the vision of cracking the 700 Mark and history has shown that sometimes even the most incredible goals can be reached [Music]
Info
Channel: Free Documentary - Engineering
Views: 33,803
Rating: undefined out of 5
Keywords: free documentary, free documentary engineering, engineering, engineering documentary, tech, tech documentary, constructions, constructions documentary, technology documentary, high speed train, supertrains documentary, supertrains
Id: jhHPhafaaRI
Channel Id: undefined
Length: 53min 37sec (3217 seconds)
Published: Sun Apr 14 2024
Related Videos
Note
Please note that this website is currently a work in progress! Lots of interesting data and statistics to come.