GVK’s Alaknanda Hydropower project

Video Statistics and Information

Video
Captions Word Cloud
Reddit Comments
Captions
I look Nanda Rivera with its source from the Himalayan glaciers is the largest tributary to the Ganga constructing a dam in its path was a Himalayan task for more than three decades the elect and the project remained on paper as many corporate companies and even the state governments irrigation department found this a difficult task to execute but a determined doctor GVK ready took up the challenge of building a hydropower plant across the river alik nanda and successfully commenced the project in the year 2006 [Music] the project started with the construction of a diversion tunnel and two coffer dams to divert the water flow and isolate the dam area every monsoon when these coffer dams were washed out and the work got suspended for four months it did not stop the construction process 17 to 18 lakh cubic meters of excavation was done at the location of the dam every day 4,500 cubic meters of concrete was used in building the base six lakh cubic meters of concrete and 13,000 tons of steel was used in the construction of the dam the dam has been designed to be a diversion dam as it is a run of the river project with a height of 248 meters and eight spillway Bay's the dam can handle 26400 cumecs of flood six intake tunnels sized 5.6 meter diameter each have been built upstream to divert the water into two main head race tunnels of 9.8 meter diameter each through these head race tunnels the water travels more than a kilometer to reach the desilting baisama this 240 meter long desilting Basin is designed in such a way that the turbulent flow of the water coming from these head race tunnels converts into the laminar flow through this silt particles of sizes larger than 0.2 mm will be trapped the silt particles that gather at the bottom of the basin are flushed back into River through underground tunnels making the water silt free a 3.2 kilometer long power channel has been constructed to take the silt free water from the desilting basin to the forebay add the for bail for penstocks of diameter 5.6 meter and length of 114 meter were built they can take the water to the turbines down below at the power house with a net head of sixty five point nine seven meters at the power house the kinetic energy of the flowing water is converted into mechanical energy by rotating a turbine which turns the generator thereby converting mechanical energy into electrical energy the power house with four units of eighty-two point five megawatt each has a capacity to produce 330 megawatt of power to synchronize and transmit the generated power to the grid a switch yard has been constructed near the power house the SCADA enabled project allows monitoring to be done remotely and any kind of precaution can be taken for disaster management in advance [Music] constructing a mega structure like this takes a lot of courage and commitment not mere engineering expertise in 2013 heavy rains and the resultant floods breached the construction area with a huge deposit of silt destroying a great portion of work under progress despite these setbacks and one of the worst floods in recent history the project was back on track and was successfully completed and commissioned in 2015 in the course of the project GVK has substantially contributed towards the rehabilitation of the displaced people instead of taking a strictly commercial legal approach GVK chose to act in a humanitarian way with great patience and empathy the two-hundred-year-old tari daily temple was relocated to a new concrete structure at the same place several roads and bridges were constructed providing convenience for an easy livelihood of the local people [Music] by adding 330 megawatt hydro potential to the grid this project has transformed the lives of the local people of Uttarakhand and the country as a whole this is a bold achievement for GV KT while being another step towards meeting the country's energy needs in an environment friendly manner GVK stands as an example of a responsible private enterprise that refuses to sacrifice its values and the environmental responsibilities in the face of extreme odds the company has quite literally moved mountains to bring light into the lives of the people [Music] GVK Alec Nanda Hydro Power Company Limited [Music] you
Info
Channel: OfficialGVK
Views: 226,207
Rating: 4.8183694 out of 5
Keywords:
Id: 5RyPN7RAtKM
Channel Id: undefined
Length: 6min 51sec (411 seconds)
Published: Thu Oct 05 2017
Related Videos
Note
Please note that this website is currently a work in progress! Lots of interesting data and statistics to come.