The $11BN Tunnel Connecting Scandinavia to the Mediterranean

Video Statistics and Information

Video
Captions Word Cloud
Reddit Comments
Captions
the scanmed corridor runs from finland all the way down to malta and thanks to a bridge over the sea at copenhagen it's all pretty easy going until you reach that rather large mountain range called the alps for decades that's slow traveled down creating a torturous bottleneck on what's otherwise a very slick route to solve the problem the eu is now digging an 11 billion us dollar tunnel directly through the very heart of the mountains to effectively link scandinavia with the mediterranean it's an astounding feat of construction that will better connect a continent [Music] believe it or not this picturesque valley is actually one of the most important links between northern and southern europe sitting 1371 metres above sea level the brenner pass is the lowest passage through the alps and can be used all year round in 1867 the brenner railway was built to improve capacity and by the 1970s it was joined by the e45 motorway creating a major freight thoroughfare for traffic heading from the north sea down to the mediterranean and vice versa today the brenner pass carries 40 percent of all freight over the alps but due to the steep inclines that you'd expect to find in the alps and the impact that has on reducing the speed of trains over two-thirds of freight actually travels by road this combined with the leisure market in the region made the area notorious for traffic jams noise and poor air quality and in 1994 the eu decided to take action modifying the existing railways is pretty impractical due to the terrain so the decision was made to construct an entirely new railway directly through the mountains somewhat dramatically getting around those steep inclines and meandering routes that slow trains down starting at innsbruck in austria and connecting to fortesa in italy the main route of the brenner-based tunnel will run for 55 kilometers when connected to the innsbruck bypass tunnels built in 1994 the project will become the longest underground rail connection in the world with a total length of 64 kilometers surpassing even the gotthard-based tunnel in switzerland the overall project consists of an exploratory tunnel used to gauge the route's conditions prior to construction and to act as a drainage system on completion twin main tunnels set 70 meters apart which will carry trains in either direction and four lateral access tunnels that connect to the surface and allow for spoil and materials to be moved in and out if that weren't enough the two main tunnels are connected every 333 meters and three emergency stations have been constructed 20 kilometers apart to provide escape routes and refuge for passengers works first began in 2008 and excavations now been progressing across four main sites for more than a decade it probably won't surprise you that digging a long tunnel through a mountain is not easy and this is no exception the route happens to run through four distinct rock types and one of europe's longest fault lines so construction of the tunnels consists of a roughly 50-50 split between traditional blasting and the tunnel boring or tbm methods for sections created by blasting explosives are loaded into pre-drilled holes and detonated loosened material is then removed with heavy machinery in a process known as mucking once cleared shock great is applied to stabilize the surface and anchors and lattice arches and reinforcement mats are installed to provide structural support the whole process then moves forward and repeats itself the tbm sections are in principle much simpler the machine excavates material removes it via conveyor belts and applies tunnel reinforcement itself as it moves forward through the rock regardless of which method is used once excavated the tunnels are completed in largely the same way with only minor differences to their final appearance with an inner diameter of 8.1 meters the project will see an incredible 21.5 million cubic meters of material excavated altogether we're not sure how many yodels that's equivalent to but it's a lot around a third of this material will be recycled reused as concrete aggregate within the tunnel itself the rest will go to five sites along the route to be disposed of in a sustainable way acting as fill for areas that can be reforested and landscaped once the product is complete returning the site to its original use when it finally completes in 2028 some 20 years after construction first began the incredibly direct brenner base tunnel will allow trains to reach 200 kilometers an hour and the journey from innsbruck to orteza will go from 80 minutes to just 25 it's a feat of construction that'll create a cleaner and more sustainable transport link not just through a mountain range between two countries but from scandinavia all the way down to the mediterranean if you enjoyed this video and you want to get more from the definitive video channel for construction subscribe to the b1m you
Info
Channel: The B1M
Views: 4,166,071
Rating: undefined out of 5
Keywords: B1M, TheB1M, Construction, architecture, engineering, The B1M, Fred Mills, building, rail, tunnel, tbm, alps, italy, austria, brenner, base, EU, European union, infrastructure, train, tunnel boring machine, brenner base tunnel
Id: 30foJiPUrBA
Channel Id: undefined
Length: 6min 16sec (376 seconds)
Published: Wed Jun 16 2021
Related Videos
Note
Please note that this website is currently a work in progress! Lots of interesting data and statistics to come.