Sandy Vans attempts the FIRST ever 24 hour van build?!

Video Statistics and Information

Video
Captions Word Cloud
Reddit Comments
Captions
hey everybody this is Alan here with Sandy Vans and today we have a special project for you we're going to turn this empty cargo van into one of our full build outs in 24 hours [Music] [Music] [Music] all right guys just like Alan said we are doing a 24-hour build non-stop 24 hours we're going to make it happen we're going to take this cargo van that is 99.9 empty we added a subfloor that is just because we had to wait for glue dry time so all you haters out there knock it off we also got wheels and tires wheels and tires on there we try to get Discount Tire to come up in here they didn't fit so uh we we couldn't make that happen either so the build is starting basically from the ground up and we're gonna get it all done in 24 hours we are very faithful and our team and our processes that we've already created here at Sandy Vans and can't wait to give you all a good show all right let's introduce the team foreign the engineer Shiva Jason and weed Builder Stolt this team's gonna create a beautiful van for you in 24 hours also not pictured Brian he's he's a little late [Applause] huh [Music] thank you [Music] [Music] one hour in I think we got window holes in window on the other side in we're about to start on wire runs flooring and insulation and plumbing yeah right now I'm building the flagship Saint Advanced electrical system we got 412 amp hours for lithium battery full redar system um we're gonna have a 2000 watt inverter in here as well so this is the standard what we put in all sandy Vans and we're building it I'm trying to knock it out in two hours this usually takes about six to eight hours but I already make a good progress [Music] all right [Music] all right shout out to board and Brew thank you guys so much to fuel the team come get the girl boys [Applause] [Music] [Applause] so we are still on the electrical system I just now got the inverter in stock so we're putting it all together all the wiring is being pulled through the van right now so once I finish this box it'll be ready to be installed and that is the efficiency we're looking for today but here's the redarc TV Ms this is all internally relayed and fused this is a great system it interfaces with our redarc red vision control panel we have dimmer functions we have all of our drops connected to this minus the high power draw drops but red Arc greatest system out there super stoked on it [Applause] [Music] [Applause] [Music] all right four is good I don't know [Music] all right guys we are six hours in I want to show you some of the progress of the 24 -hour bill so far what we've got done is boring started with flooring we did the full wire run so as you can see wired is everywhere that's nearly complete electrical system is built it's set in here that is the full red Arc uh electrical system that still put together so we actually will be selling that as a kit in the future we got lowers in full insulation everywhere obviously cut in these windows yeah these are these are coming along so we are one fourth of the lake room and I'm feeling pretty confident foreign so of course I decided to do a completely different lighting design I've never done this before so why not do it in the 24 hour build but basically the light is already set I have the drops inside ready to go so as we put the ceiling in the light feature is already connected to it so we're going to put the back half of the ceiling up and then we're going to bring this piece up and then we're gonna have this offset it's a light feature longer in the slider and then the longer out the back so the lighting will be in the correct areas in my opinion so can't wait to show you God bless America all right foreign electrical system everything's working on that that's one of the big tests right you've got your big systems test your electrical and your plumbing the electrical test just passed so that's a huge milestone our plumbing system drops in we're about to get the second half of that in the van test that if we don't have any leaks then we're looking good for making this within 24 hours we do have leaks it's going to be tights slow is the name of the game and then you just Gap I'm doing this one this work thanks [Music] [Music] foreign [Music] 19 hours into this build so just go over five hours left and we got good news so we got bad news hey guys are uh are slowing down quick it's uh it's last-ditch effort here but it is looking good you know we got the Cabinetry in Oregon the lights are on uh electrical is nearly complete uh yeah it's kind of the last finishing touches but if you come around the back there is a little hiccup and we're gonna have to sort out oh exterior completely done you've got the blue smoke we have a starboard rack get the side ladder on the other side with the roof rack with uh Diamond panels then we're working on this uh Center section here for the U dinette and somehow it just it grew a little bit more than anticipated so the the other pieces that we have our table and our back bench top he's not quite wide enough and it's already poly ready to go so it's gonna be kind of close we'll see thank you [Music] [Music] [Applause] [Music] oh we made it 24 hours I don't know how I'm alive right now there's a bunch of zombies uh dude I gotta go but we proved we can do it say any minutes [Applause] thanks to the local companies who donated food drank all the uh DJs who came in and kept us the uh positive and energy flowing and uh awake and [Music] [Music] picking around on a piece of ground in your hometown [Music] time to watch the rain
Info
Channel: Sandy Vans
Views: 10,157
Rating: undefined out of 5
Keywords:
Id: ts__6YzJ8Ys
Channel Id: undefined
Length: 11min 15sec (675 seconds)
Published: Sun Aug 06 2023
Related Videos
Note
Please note that this website is currently a work in progress! Lots of interesting data and statistics to come.