and now we are on grounding system it's one of the most controversial part when it comes to solar power system installations and I have been receiving a lot of questions regarding this today I'm gonna try my best to explain this in the most profound manner so everybody can understand let's start with PV array here's our solar panels and we need a ground we also need a ground rod there you go and by using a ground wire we can connect one of the panels to the ground right supposed to be that should be enough to make the grounding system works properly but most of the professional solar installers that I bet including me sometimes I do this I bind all the solar panels with a copper wire just to make sure that there is continuity within all the panels and that is very important all solar panels must be tested if each one of them has a continuity connection from one to the next don't just rely on clumps and release because some solar panels they have a thin coating on their frames that serves as insulation if needed Bend all PBS using copper wire now you don't have to do this if you are 100 sure that all the solar panels have continuity to each other the next important thing is the ground rod has to be installed at the nearest location or right below the PV array and now let's take a look at all in one ground run okay we have the video array the dcspd of course we have our hybrid inverter the AC SPD on the AC output of our hybrid inverter and another one for the AC input of the hybrid inverter so we can just have one round rod and connect all of this into that the next thing is all in one ground using bus bar so we have our bus bar that should be pure copper and we have the ground rod and we have to connect our bus bar then we have the PV ground wire dcspd connected to the PV wire parallel to the PV wire we also have the hybrid inverter and ground wire AC SPD hybrid inverter AC output and of course the acspd hybrid inverter AC input and if needed you can enclose this with an enclosure that is rated ip65 or ip66 now let's take a look at using two separate ground rods we have our Phoebe array on this side and the main system on this side as well if there is a huge gap between these two huge distance better to have a ground rod for your PB array and another one for the main system connect your PV array on that first ground right and the main system are the second one important thing there is no certain rule when it comes to the distance but the main objective is to have the least resistance in conductors as much as possible a huge amount of distance means a longer wire is needed and could potentially increase resistance [Music]
Info
Channel: JF Legaspi
Views: 5,706
Rating: undefined out of 5
Keywords: JF Legaspi Vlog, JF Legaspi Official, JF Legaspi Solar, JF Legaspi Power Wall, Solar Off-grid Setup, Renewable Energy
Id: 4us44-VrXdU
Channel Id: undefined
Length: 3min 34sec (214 seconds)
Published: Sun Aug 20 2023
Related Videos
Note
Please note that this website is currently a work in progress! Lots of interesting data and statistics to come.