How to stack two Cisco 3750G switches

Video Statistics and Information

Video
Captions Word Cloud
Reddit Comments
Captions
[Music] hi thank you for visiting zareba comms tech tips in this video we'll be demonstrating how to stack two cisco 3750 g switches you first make sure you have the proper stacking cable ii will attach one end of the stacking cable to the stack port number one on the first switch using a flathead screwdriver tighten the screws on the stack cable you next we will attach the other end of the stack cable to stack port number two on the second switch again tighten the screws you next we will boot the switches to confirm the stack was successful make sure you have a console cable plugged into one of the switches and have teraterm open on your PC you after boot the system will prompt you to press ENTER to continue after pressing enter confirmation will show on the screen that the switches have been added to the stack if any of the switches are not showing added and confirm your cable is connected and that the cable is not defective [Music] we hope you found this tech tip useful and informative for more tech tips please visit serega comm thank you
Info
Channel: Zeriva UsedCisco
Views: 75,239
Rating: undefined out of 5
Keywords: ZTTvid stack3750G, Zeriva, Cisco, NetworkingEquipment, 3750G, switches, stacking, How to, Cisco3750Gswitches
Id: mFh_j3r97LA
Channel Id: undefined
Length: 3min 10sec (190 seconds)
Published: Tue Oct 23 2012
Related Videos
Note
Please note that this website is currently a work in progress! Lots of interesting data and statistics to come.