How to Draw Claim Digger or Schedule Comparison in Visualizer P6| Primavera P6 | Advanced Tutorial

Video Statistics and Information

Video
Captions Word Cloud
Reddit Comments
Captions
again today my course content it on claim digger or schedule comparison in Premiere ap6 both are the same the term are different lamb digging and schedule comparison is different called changing aversion so now schedule comparison is open in visualize it Primavera p6 so I open in parameter P 6 and I show you how to create a claim digger in Primavera p6 or schedule comparison so here my my villa construction project is open so I have to compare it in this schedule this nine what you design B is 9 first do not assign this one okay and then you if nine here none okay and over maintain and restore this file is restored there is a b1 baseline and we'll a construction you can see this one both so I what I will do I will add an activity here he had a what after waterproofing add a to TA and then I will cert another activity activity B and then I will insert another activity here do you see and then I what I will do I will link this one by go to left shift here you have busy cuties with it schedule it on 5 May so you see I have added activities here new activities ABC to just show you the difference in making a claim coming clam digger or schedule comparison so going tools here you can see schedule comparison it's same as clam digger so it will be open in visualizer I will show you both positions how to open the visualizer and if you directly open visualizer you can also see schedule comparison there I will clip I have click on schedule comparison here you can see premiere of parameter P 6 visualizer is open create or open schedule comparison if you open visualizer you can find here schedule comparison Gantt chart Gantt and time scaled logical logical diagram option so create new open new from existing or open from existing so you can open from a new error from existing also I will create new comparison its Villa construction comparison comparison 5 five 2020 let option and I click on option there is a window open here in the front of you in this window here you can see you can also do you have to assign a project which is revised here it is written revised project clearly and then you have to enter a revised project so I will go for gho construction you the residence project here you can see will a construction this is my updated wheeler construction my updated and this b1 is my baseline so I will add this one this one and there I will go for baseline yeah we can directly assigned project baseline or we can assign project here if you we click on baseline it will be directly assigned business we will add a project here eh Oh same here construction and then I will go for residential with the construction v1 here you can see add button come after one clicking on one this both original project our baseline and revised when I click there is an ADD button we will go for general here you can see we can create this file into AC a text file CSV file and HTML file and this is output file source very should be output group report by activities and this is one advance in this advanced option you can show user-defined field units a deleted resource assignments I don't need a resource assignment this one this one don't need percent complete don't don't need decent permission maybe no problem expenses I don't need expenses information constraints I don't need a constraint information cord activity code assignment don't need this one notebook topics general activity information add lead general WPS information no need general project information I don't need and project budget of this one I selected some cost and durations and dislocate some informations from this one and I will go for project and I have added here when I add this to both project we will go for talk and we will so save and draw here and we can save directly to the location we have assigned I have saved and draw so here you wait it's drawing so from the top actual labor cost comparison new actual labor over luxury labor no difference new remaining labor and all remaining labor all remaining 150 thousand and the new one is zero for these activities all actual explain is war this and new this one and remaining expenses this one you can see actual material material ID cost remaining material cost here you can see the different dates you'll start date and Pinacate this was old old late started and this one is the new late start date and also but it's here yes and we can also go over there to comparison yeah I show you your comparison the users open from existing where this one existing option for their option we will go for advanced here we don't need costs and dates even though him [Music] you see total float comparison here 162 float increased in the second one free float actual duration changes zero duration in old and new duration for these activities in generation and you can see a unit percentage complete this one is zero percent because it's baseline and then this is baseline and this is the origin that's why this is changed physical complete duration percentage complete you can see all of these and you can see here at completion labor units and these were activity I have added ACTU TABC here you can see ABC here and these are predecessor and successor relationship I have assigned finish to start finish to start ABC and what roofing work I have added in front of you ACTU T ladyship added or deleted you can see here so this is my clean digger or schedule comparison I have drawn on premier p6 visualizer you can draw on it and you can also create your here you can go general CSV file you can also save and draw here your CSV file here and if we want to go there option general and if I want to go there so we can open the file here in file is opening you will see the file generated schedule comparison completely as it is you can draw filled here you want to draw filters you can apply filters here she left UT ID and all that this is my course content about claim digger our schedule comparison in visualizer and how to open and how to maintain this this is my lecture about schedule comparison and claim digger how to create claim digger a schedule comparison in Primavera p6 so like comment share and subscribe my channel and press the bell icon for lettuce account notifications see you next video
Info
Channel: SoftEdemy
Views: 1,224
Rating: 4.8571429 out of 5
Keywords: Primavera P6 Visualizer, Primavera claim digger, Claim digger in primavera, Claim digger, Prima vera, Project manager salary, Oracle, Oracle merge, Explain plan in oracle, Primavera P6, Primavera Scheduling, Schedule Comparison, Construction Science, Claim Digger, How to draw claim digger or schedule comparison in visualizer p6| primavera p6 | 19.12, P6, Primavera, P6|, Visualizer, In, Comparison, Schedule, Or, Digger, Claim, Draw, To, How, Comparing 2 baselines in primavera, SoftEdemy
Id: 2MjTC0Ou8ho
Channel Id: undefined
Length: 11min 19sec (679 seconds)
Published: Sun Feb 16 2020