[Music] you thank you for taking time to learn about gravel lock we offer two types of liquid amber and we have the clear which is UV stable today we're going to install a gravel lock porous stone paving system using the mixing method this method is a better process than the pouring method it ensures that gravel lock gets over all the stones mark out the shape of your patio allowing a couple inches for over excavation excavate out approximately five to six inches from surface and remember call Miss utility before every day this grab a lock job is going to be bordered in with a manufactured concrete paver set and concrete we split wall block to make our edging stone we want this edge to look natural so what we're doing is taking a chisel and roughing up the outer edge of the stones lay out all your edging stones to make sure you have enough this patio needs a step going from one surface to another we are installing several large stepping stone before we pour concrete for the curbing we need to mark out areas where piping needs to go these are called sleeves prepare for irrigation lighting electrical etc we're ready to install the curbing mix concrete in the mixer or wheelbarrow our blocks are three inches tall we are going to set them in about two to three inches of concrete making sure concrete's on both sides holding the block in place the great needs to go on the subgrade instead of the surface allow one inch of grade away from structure per ten feet and on the sidewalks you need to find the lowest end and grade everything to the corner make sure all sleeves and drainage pipe is in before you start the next process now it's time to compact the subgrade I want to make sure the flatter it is the better the water can drain to the low side this house has a basement when installing permeable surfaces you need to put a moisture barrier up against a house four foot away so no water leaks in the basement now you're going to install SF 40 geo textile fabrics we like a nonwoven geo textile fabric be sure to overlap and wrap all sides we are installing a 4-inch LSG load support grip expand your load support grid starting at one end of the job and stretching it to the other side lining it up with an edge pull tight and over cut using a razor knife sometimes spikes are used to hold it open but since we have a moisture barrier against the house here we are going to fill in with stone to hold the grid so we can pull touch layout the next piece of LSG it is important to staple the grids in the proper space if you line up the pre-engineered holes and put a staple parallel with the holes you are creating a weld there are two ways of connecting LSG the top and bottom of the grid you will line up the pre engineer holes again and create a weld in the center by using a stapler be sure to infill your grid with the proper aggregates we're using a number 8 stone the stone is 3/8 inch in size angular fill the LSG load support grid approximately an inch over top rough grade out approximately empty and a half from top surface and for large areas I like to use an asphalt rake and some string line a very important process is compaction the stronger the foundation the better the overall structure will be the goal is 95% compaction after compacting for the first time you will need to adjust there will be areas that get compacted down and you'll need to add more gravel so we're doing an inch and a half of mixed gravel lock pebbles this is where we're going to want to be as accurate as we can so the adjustment layer is important rinse the number-8 stones off this ensures a better bond when we use gravel lock with gravel lock pebbles gravel lock will drip off the gravel lock pebbles and bond to this surface to cleaning the stone the better the bond after you rinse off entire subgrade now you can compact one more time trying to get the surface as level as possible we are going to lay flagstone in the patio area and fill the joints end with gravel if you have trouble adjusting stones a little mortar can be used under them it still remains pervious gravel on pebbles come in 50-pound bag 2,000 pounds super sacks and 3,000 pounds supersets they've been pre-washed dried and are ready to mix comes in four natural colors and four custom colors just ask your local dealer for pricing acetones will dilute gravel luck enough for you to wipe it off your tools and any surfaces that you get it on the ratio you need to mix is one five gallon bucket of gravel to about 16 the 18 ounces of gravel on one gallon of gravel Locke will do 30 square feet at an inch and a half they we chose to use the UV stable clear gravel lock the first mix of the day might require a little more grab a lot use a pan or a bucket and have some acetone ready place the gravel lock pebbles on the base course between your stepping stones try not to get them on the surface of the stepping stones you mean to trowel out and compact gravel lock pebbles in the place you want them to be make sure that the finish you put on the top is what you want if you have highs and lows it'll harden that way allow grab a lock to cure for at least 24 hours before doing your final step the last step we want to do is called a roll coat this will ensure the gravel lock pebbles on top for an extra bond clean surface of debris and fix any area you do not like you are going to need a paint roller and some gravel lock acetone and pair goes use a small roller to roll coat in between the stones try not to get any on top of the stones while doing this process you will get a little on a corner of a stone that's why we use acetone acetone will dilute the product soak a rag by putting a little puddle of acetone on top of the spill then wipe off with a clean side of the rag you might have to do this process twice do not pour acetone on this bill because acetone will drip off into your gravel lock weakening the system allow 24 hours for gravel lock to dry before applying a roll coat it takes one gallon of gravel lock to roll coat 100 square feet a roll code puts a double bond on the surface stones where they touch each other it is recommended to do this process every six to eight years in high traffic areas you might need to do this process sooner you want to use a medium nap roller and put thin layers on remember you can always go back and add more too much is a waste of material when you finish with this process clean up your tools allow 24 hours for dry time and please remember to be safe wearing respirators gloves eye protection and read the MSDS before venturing into gravel lock systems Safety's first remember we want to be safe doing any projects celtech wants to thank you for your time and the interest of gravel Locke WWL techdirect calm [Music] [Music] [Applause] [Music] you
Info
Channel: Gravel Lok
Views: 2,091,067
Rating: undefined out of 5
Keywords: Gravel-Lok, landscape, walkway, installation, gravel, patio, Construction
Id: UVwtJcctliE
Channel Id: undefined
Length: 10min 16sec (616 seconds)
Published: Fri Apr 20 2012
Related Videos
Note
Please note that this website is currently a work in progress! Lots of interesting data and statistics to come.